Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

LED Price Signs Fabrication & Installation-NJ, NY & PA
Renovation
Post-Bid

Boiler Maintenance Kits installed/Inducer Replacements
Post-Bid
Newark, NY 14513

Generator Transfer Switch Improvement Project
Results

Newark Campus Building 68 Electrical and Control Upgrade
Results
Less than $50,000 est. value
Newark, NY 14513

Circuit Breakers & Test Equipment
Term Contract
Post-Bid

2021-2026 Residential Generator Maintenance and Repair Services in Chemung, Livingston, Monroe, Ontario, Schuyler, Seneca, Steuben, Wayne, Wyoming and Yates Counties
Term Contract
Results

Exterior Sign & Lighting Maintenance
Alteration
Post-Bid

Rose Generator Upgrade
Alteration
Results
Less than $50,000 est. value
North Rose, NY 14516

LED Price Signs Fabrication & Installation - NY, NJ, & PA
Term Contract, Alteration
Post-Bid

Replace Standby Generators
Alteration
Results
$250,000 to $500,000 est. value
Dansville, Sodus, NY 14437

General, Electrical, Plumbing, Building & Yard Emergency Services At LNA Service Stations
Term Contract
Post-Bid

Generator Installation Newark IRA
Alteration
Results
Newark, NY 14513

Cuyler Bathroom Design
Alteration
Post-Bid
Less than $50,000 est. value
Newark, NY 14513

2022 Capital Project Regional Support Center Wayne-Finger Lakes BOCES - Electrical Work
Alteration
Post-Bid
Newark, NY 14513

Last Updated 05/12/2022 07:21 AM
Project Title

522 Church Street - Generator Install

Physical Address View project details and contacts
City, State (County) Newark, NY 14513   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Completely Install Generator, and Transfer Switch for residence. 1. Furnish materials and labor to Completely Install the Generator and Transfer Switch System as per engineered drawings by: Infinity Engineering, Dated: 6-21-2021 2. Upon completed installation, vendor must complete “Installation/Pre-Startup Check Sheet” and submit to Emergency Power Systems (EPS). A technician will be assigned to the job to review the work and start-up of generator for warranty purposes. 3. Vendor must also contact Middleton Engineering for review of services performed. 4. All work will be inspected by: Middle Department Inspection Agency, and coordinated by FLDDSO Maintenance Point of Contact listed above. Please notify contact when inspection can be completed. Inspection documents must be submitted to the DDSO contact listed above before payment will be processed. 5. No splicing of service conductors is allowed in the system. Lug to lug connections are strictly enforced. 6. Panels must be re-wired as sub-panels for isolating neutrals. 7. All work to be done per New York State, Federal Regulations, and 2014 NEC code. 8. Test and tune equipment for optimal performance. Submit startup documentation for warranty verification. 9. Generator and Transfer switch to be picked up by vendor @ Newark Transportation Building, Newark, NY.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents