Similar Projects
Placentia Canal Drainage Improvements-Laroche and Semken Culvert Replacement
Infrastructure
Bidding
Savannah, GA 31404

Road Paving Evergreen Extension
Infrastructure
Bidding
Sky Valley, GA

Beechwood Circle Drainage Replacement
Post-Bid
Lawrenceville, GA 30046

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

Cumming Utilities Shop South Parking Lot - Grading, Curb, Drainage and Paving Project
Infrastructure
Bidding
Cumming, GA 30040

Grayland Hills Drive Drainage
Post-Bid
Lawrenceville, GA 30046

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

Earthen Bank Slope Repair
Infrastructure
Bidding
Less than $750,000 est. value
Dahlonega, GA 30533

Street and Drainage Improvements to Oak Lane
Post-Bid
Less than $250,000 est. value
Argyle, GA 31623

Installation of Street and Drainage Improvements to Velie Road
Results
Less than $135,510 est. value
Nahunta, GA 31553

Lake Park Road Box Culvert Repair
Infrastructure
Bidding
Valdosta, GA 31601

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

Airfield Drainage Rehabilitation - Phase 2
Results
Less than $642,658 est. value
Cordele, GA 31015

Last Updated 03/08/2022 09:48 AM
Project Title

Woofstock Park Drainage Improvements

Physical Address View project details and contacts
City, State (County) Woodstock, GA 30188   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes installing new stormwater infrastructure in the Woodstock Dog Park of Dupree Road to improve the overall drainage within the park. The work includes, but is not limited to installing HDPE pipe, filter fabric, washed stone and grading.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents