Similar Projects
23 Mile Road Water Main Replacement
Infrastructure
Post-Bid
Macomb, MI

Water Service Installations and Repairs
Term Contract, Infrastructure
Post-Bid
Sterling Heights, MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Water Pipe and Fittings and Hydrants
Term Contract
Results
Mount Clemens, MI

2022-2023 Sewer and Water Repair Supplies and Water Meters Contract
Term Contract
Post-Bid
Saint Clair Shores, MI 48080

23 Mile Road Water Main
Results
Chesterfield, MI

2022-2025 Commercial Water Meter Testing, Repair and Replacement Contract
Term Contract
Post-Bid
Saint Clair Shores, MI

Maintenance of Irrigation and Park Restroom Water Systems
Results
Sterling Heights, MI

Water Extension 32 Mile and Powell Roads
Infrastructure
Post-Bid
$2,000,000 est. value
Washington, MI

Check Valve Replacement
Results
Warren, MI 48089

2022-2023 DWRF Water Main Replacement Project
Infrastructure
Post-Bid
$200,000 est. value
Eastpointe, MI

2021 Water Main Replacement Project
Results
$3,325,000 est. value
Eastpointe, MI

Easement Acquisition Services
Infrastructure
Post-Bid
MI

Harmon Street Reconstruction And Water Main Replacement
Results
Less than $1,500,000 est. value
Saint Clair Shores, MI

14 Mile Water Main Replacement, Hoover Road to Hayes Road
Infrastructure
Post-Bid
$600,000 est. value
Warren, MI 48093

Reported 06/28/2022 09:25 AM
Project Title

Water Main Replacement Medville - City of Sterling Heights

Physical Address View project details and contacts
City, State (County) Sterling Heights, MI 48312   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. The project is included in the City of Sterling Heights FY 2023 Capital Improvement Program (CIP). As of June 25, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents