Similar Projects
(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Lead (Based Paint) Hazard Reduction Program (LHRP) - Rebid
Renovation, Alteration
Results
Rock Island, IL 61201

2021 Moline High School A-Wing Asbestos Abatement
Alteration
Results
$30,000 est. value
Moline, IL 61265

Lead (Based Paint) Hazard Reduction Program (LHRP)
Alteration
Post-Bid
Rock Island, IL 61201

Asbestos Abatement at Jefferson Elementary School
Alteration
Results
Niles, IL 60714

On-Call Environmental Services
Term Contract
Post-Bid
Chicago, IL 60661

Tefft MS Fire Alarm Replacement, First and Second Floor Asbestos Abatement
Alteration
Results
Streamwood, IL 60107

Asbestos Removal
Alteration
Post-Bid
Hanover Park, IL 60133

Lyons Township HS 2022 Asbestos Abatement
Alteration
Results
La Grange, IL 60525

Engineering Services for Downtown Metra Station Phase I and II Site Assessment and Investigation
Infrastructure
Post-Bid
Crystal Lake, IL

Abatement of Flooring and Lab Tops
Alteration
Results
Breese, IL 62230

Asbestos Abatement
Alteration
Post-Bid
Peoria, IL 61603

Asbestos Abatement for Addition and Renovation
Alteration
Results
Frankfort, IL 60423

North Jefferson Street (Il 4) Shared Use Path
Infrastructure
Post-Bid
$324,013 est. value
Mascoutah, IL 62258

Last Updated 05/09/2023 08:08 AM
Project Title

Demolition of Building at 108 W Campbell Ave

Physical Address View project details and contacts
City, State (County) Rantoul, IL 61866   (Champaign County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $14,607 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Village has determined to proceed with the Project and to invite bids from prospective contractors to undertake the Work, which is to be commenced within thirty (30) calendar days after the Demolition Contract is awarded by the Village and completed within a period not greater than ninety (90) calendar days thereafter, such Work being more particularly described in the Scope of Work included in the Contract Documents. Dwellings: A. Demolish and dispose of the two-story, single-family house and all of its contents located at 108 W Campbell Ave, Rantoul, IL B. Remove and dispose of the concrete foundation, including the building footings and concrete floor slabs. Property A. All municipal sidewalks are to remain. It is the contractors responsibility to replace any municipal sidewalks damaged during demolition. B. Remove all of the private sidewalks and stoops at the front, side and rear of the house. C. Remove all concrete, stone and brick at the back and side of the house. D. Dispose of all junk and debris from all yards, including, but not limited to, concrete, brick and wood. E. Remove all bushes, brush, tree limbs and small nuisance trees around the house.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents