Similar Projects
Construction of the Water, Sanitary Sewer, and Drainage Facilities to Serve Riverstone Ranch at Clear Creek, Sections Fifteen and Sixteen
Bidding

Water, Sanitary Sewer, Drainage Facilities and Paving and Appurtenances to Serve Caldwell Ranch Section 5
Bidding

Water, Sanitary Sewer, Drainage, and Paving Facilities for Sterling Lakes Drive Street Dedication
Post-Bid
TX

Reinforced Concrete Storm Sewer Box Culverts Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Del Bello Section 1
Results
TX

Water, Sanitary Sewer, and Drainage Facilities to Serve Bluewater Lakes Section 6
Results
TX

Water and Drainage Facilities to Serve Post Road Street Dedication Section 1
Bidding
TX

Mustang Bayou Bank Repair at National Oak Park
Post-Bid
Alvin, TX 77511

Water, Sanitary Sewer, and Drainage Facilities to Serve Bluewater Lakes Section 5
Results
TX

Bridgeland Parkland Village Section 57 Water Distribution System, Sanitary Collection System, Storm Drainage System, and Street Paving
Bidding
Houston, TX

Piper Road Drainage Project
Post-Bid
Pearland, TX

Water, Sanitary Sewer, and Drainage Facilities to Serve Pollard Boulevard Phase 2
Results
TX

Chocolate Bayou Detention Phase Three (Basin U) and Earthwork to Serve Meridiana
Bidding
$500,000 to $749,999 est. value
TX

CDBG-DR Drainage and Paving Improvements
Post-Bid
Holiday Lakes, TX

CR 203 at CR 732 Bulkhead Repair
Results
Less than $230,000 est. value
TX

Last Updated 04/13/2021 03:36 PM
Project Title

Drainage Improvements West of SH 332 / 2010 Bond Project / Yaupon Ditch Lining SH 332 to Walnut Street / Walnut Street Crossing Replacement

Physical Address View project details and contacts
City, State (County) Lake Jackson, TX 77566   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $762,000 to $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: remove existing multiple concrete pipe culvert, structure headwalls, street pavements / walks, and downstream ditch lining transition to include water line crossing and replacing with reinforced concrete multi box culvert with headwalls / railings and ditch lining transitions.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents