Last Updated | 09/15/2023 04:14 PM |
Project Title | Painesville 168 N. St. Clair Street Building Demolition |
Physical Address | View project details and contacts |
City, State (County) | Painesville, OH 44077 (Lake County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $460,458 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference #: CBR23042498 The building to be demolished is an office building at 168 North St. Clair Street, Painesville, Ohio 44077. The building consists of a masonry walls, bar joists and wood frame roof, and typical materials used in the 1960's. Asphalt parking lot, site utilities, sidewalks, and miscellaneous site amenities must also be removed. Asbestos and universal waste materials to be removed in advance of building/site demolition. Site improvements includes filling building foundations with clean materials, finish grading, providing for positive drainage and seeding site. The work requires the Contractor(s) to furnish all labor, material, tools, equipment, utilities, and other services and to comply with applicable laws and requirements, and to obtain all requisite permits and approvals. Work will be performed as follows: 1. Mobilization, permitting support, insurance and bonding, contract management and support services and preparation of submittals such as work plans and certification of training and experience, site security arrangements, health and safety planning and ensuring de-energizing of building systems. 2. Removal of hazardous or toxic materials from all buildings, such as asbestos, CFC's (refrigerants), mercury, and other metals, universal wastes (ballasts, light tubes, switches). 3. Demolition of building, remaining site utilities, removal of select pavement areas, excavation and engineered backfill. 4. Backfilling, grading and site restoration, construction of positive flow drainage system. Activities are to be conducted in a manner that ensures proper management and off-site disposal of material that cannot be reused. All work is to be performed in compliance with applicable regulations. Please contact the Plan Room at (440) 530-2395 or planroom@ctconsultants.com if you experience problems viewing, registering or paying for the documents. All project-related questions during bidding should be addressed to the contact listed in the comments field for that particular project. Special Conditions of Use for Electronic Files and Hard Copies of Plans and Specifications: The electronic files and hard copies thereof of the plans and specifications may be utilized by prime contractors to see if they wish to purchase the entire set of plans and specifications and by subcontractors, vendors, suppliers, and manufacturers to prepare quotes to prime contractors for that project. Any other use is strictly prohibited. The electronic files and hard copies thereof of the plans and specifications may be utilized by construction news agencies to inform contractors, subcontractors, vendors, suppliers, and manufacturers of projects available for bid and the scope of the project. Any other use is strictly prohibited. No electronic files may be sold or distributed for a per project or per file fee. No hard copies thereof may be distributed except that one copy may be printed for use in each Plan Room and must be destroyed within 7 days after the Bid Opening. All electronic files presented on the CT Consultants, Inc. website or hard copies thereof and all electronic files and/or hard copies of the plans and specifications purchased or otherwise received directly or indirectly from CT Consultants are copyright protected materials and except as noted above are not to be reproduced in any form or otherwise utilized in whole or in part without expressed written permission from CT Consultants, Inc. The Opinion of Probable Construction Cost $425,000.00 to $475,000.00. Question Deadline 09/11/2023 at 9:00 AM ET Bid Results: ntractA Building Demolition BF.ll - 12 Moderalli Excavating, Inc. 171,729 Contract B Asbestos Abatement & Hazardous Material Removal- BF. 13A - 15A Moderalli Excavating, Inc. 117,00 Safeair Contractors Inc. 117.000 Contract C Combined (A & B) BF16A-18A Moderalli Excavating, Inc. 288,729 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |