Similar Projects
Demolition - Boley Building
Demolition, Infrastructure
Design
$30,000 CJ est. value
Wellsville, OH 43968

Construction, Maintenance, Environmental, And Testing Services (COMETS)
Term Contract
Design
Cleveland, OH 44115

RFQ D/B-Bill Davis Stadium - Softball Field Video Infrastructure
Renovation
Bidding
$618,000 CJ est. value
Columbus, OH 43210

Former County Home, Boiler House, and Water Sanitation Building Demolition Project
Addition, Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Saint Clairsville, OH 43950

RFQ- Construction Manager at Risk for Cleveland Metroparks Zoo-Wide Construction Projects (2024-2029)
Renovation
Sub-Bidding
$400,000 CJ est. value
Cleveland, OH 44109

Asbestos Abatement Services (Alexis) - Watershed
Infrastructure
Post-Bid
$250,000 est. value
Cleveland, OH

Household Hazardous Waste
Term Contract
Post-Bid
Kettering, OH 45429

James E Hanna Elementary School Abatement and Demolition Project
Demolition, Infrastructure
Results
$750,000 est. value
Parma, OH 44130

Jefferson Elementary School Abatement
Renovation
Results
$77,000 est. value
Gahanna, OH 43230

Renovations for Magee Marsh Migratory Bird Center
Renovation
Construction
$2,962,862 CJ est. value
Oak Harbor, OH 43449

Primate Forest Mesh Replacement
Infrastructure
Construction
$163,375 CJ est. value
Toledo, OH 43609

Industrial Park
New Construction, Infrastructure - 94,500 SF
Pending Verification
$13,500,000 CJ est. value
Dayton, OH 45414

Mowing - FY2024
Term Contract
Sub-Bidding
$800,000 CJ est. value
Ashley, OH 43003

Contractor - CHIP Lead Abatement
Alteration
Post-Bid
Georgetown, OH

Demolition of Carver Park A and B Block
Demolition, Infrastructure
Results
$2,482,000 CJ est. value
Cleveland, OH 44104

Last Updated 09/15/2023 04:14 PM
Project Title

Painesville 168 N. St. Clair Street Building Demolition

Physical Address View project details and contacts
City, State (County) Painesville, OH 44077   (Lake County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $460,458 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reference #: CBR23042498 The building to be demolished is an office building at 168 North St. Clair Street, Painesville, Ohio 44077. The building consists of a masonry walls, bar joists and wood frame roof, and typical materials used in the 1960's. Asphalt parking lot, site utilities, sidewalks, and miscellaneous site amenities must also be removed. Asbestos and universal waste materials to be removed in advance of building/site demolition. Site improvements includes filling building foundations with clean materials, finish grading, providing for positive drainage and seeding site. The work requires the Contractor(s) to furnish all labor, material, tools, equipment, utilities, and other services and to comply with applicable laws and requirements, and to obtain all requisite permits and approvals. Work will be performed as follows: 1. Mobilization, permitting support, insurance and bonding, contract management and support services and preparation of submittals such as work plans and certification of training and experience, site security arrangements, health and safety planning and ensuring de-energizing of building systems. 2. Removal of hazardous or toxic materials from all buildings, such as asbestos, CFC's (refrigerants), mercury, and other metals, universal wastes (ballasts, light tubes, switches). 3. Demolition of building, remaining site utilities, removal of select pavement areas, excavation and engineered backfill. 4. Backfilling, grading and site restoration, construction of positive flow drainage system. Activities are to be conducted in a manner that ensures proper management and off-site disposal of material that cannot be reused. All work is to be performed in compliance with applicable regulations. Please contact the Plan Room at (440) 530-2395 or planroom@ctconsultants.com if you experience problems viewing, registering or paying for the documents. All project-related questions during bidding should be addressed to the contact listed in the comments field for that particular project. Special Conditions of Use for Electronic Files and Hard Copies of Plans and Specifications: The electronic files and hard copies thereof of the plans and specifications may be utilized by prime contractors to see if they wish to purchase the entire set of plans and specifications and by subcontractors, vendors, suppliers, and manufacturers to prepare quotes to prime contractors for that project. Any other use is strictly prohibited. The electronic files and hard copies thereof of the plans and specifications may be utilized by construction news agencies to inform contractors, subcontractors, vendors, suppliers, and manufacturers of projects available for bid and the scope of the project. Any other use is strictly prohibited. No electronic files may be sold or distributed for a per project or per file fee. No hard copies thereof may be distributed except that one copy may be printed for use in each Plan Room and must be destroyed within 7 days after the Bid Opening. All electronic files presented on the CT Consultants, Inc. website or hard copies thereof and all electronic files and/or hard copies of the plans and specifications purchased or otherwise received directly or indirectly from CT Consultants are copyright protected materials and except as noted above are not to be reproduced in any form or otherwise utilized in whole or in part without expressed written permission from CT Consultants, Inc. The Opinion of Probable Construction Cost $425,000.00 to $475,000.00. Question Deadline 09/11/2023 at 9:00 AM ET Bid Results: ntractA Building Demolition BF.ll - 12 Moderalli Excavating, Inc. 171,729 Contract B Asbestos Abatement & Hazardous Material Removal- BF. 13A - 15A Moderalli Excavating, Inc. 117,00 Safeair Contractors Inc. 117.000 Contract C Combined (A & B) BF16A-18A Moderalli Excavating, Inc. 288,729

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents