Similar Projects
Dredging Support for the Great Lakes and Ohio Rivers Division (LRD)
Bidding

Dredging Support for the Great Lakes and Ohio Rivers Division (LRD)
Bidding

FY 20 Maintenance Dredging
Post-Bid
$1,000,000 to $5,000,000 est. value
Detroit, Grand Haven, Saginaw, Saint Clair, MI

FY 20 Maintenance Dredging
Post-Bid
$1,000,000 to $5,000,000 est. value
Detroit, Grand Haven, Saginaw, Saint Clair, MI

FY18 Great Lakes Dredging (MATOC)
Results
Less than $130,000,000 est. value
Detroit, MI

Hydraulic Dredging
Results
Elk Rapids, MI

Great Lakes National Program Office - Remediation
Post-Bid
Less than $300,000,000 est. value
Chicago, IL - Muskegon, MI - Duluth, MN

Portage Lake Outlet Dredging
Results
Hancock, MI

Grand Island Dredging
Post-Bid
Munising, MI 49862

New Soo Lock Upstream Channel Deepening
Results
$25,000,000 to $100,000,000 est. value
Detroit, MI 48226

Maintenance Dredging Sources Sought
Post-Bid
$500,000 to $1,000,000 est. value
Holland, Manistique, Monroe, Ontonagon, MI

2020 Maintenance Dredging Black River Canal Entrance At Lake Huron
Results
Port Huron, MI

FY20 Maintenance Dredging Saginaw River, Michigan
Post-Bid
$1,000,000 to $5,000,000 est. value
Saginaw, MI 48602

2020-2022 Black River Maintenance Dredging, Dock Installation, Removal & Maintenance Downtown Marina
Results
Port Huron, MI

FY20 St. Clair River Maintenance Dredging
Post-Bid
$500,000 to $1,000,000 est. value
Saint Clair, MI 48079

Last Updated 01/27/2021 04:36 AM
Project Title

2021 Maintenance Dredging Black River Canal Entrance at Lake Huron

Physical Address View project details and contacts
City, State (County) Port Huron, MI   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 0-6,000 cubic yards of sand from the Lake Huron entrance of the Black River Canal and deposit dredged material waterward of Lake Huron’s edge and no farther than the second sand bar within the approximately 820-foot long area along Conger Street between Holland Avenue and 3470 Conger Street or along the approximately 1,250 feet long area at Lakeside Park, complete, as per the project specifications and in accordance with Department of Army and EGLE/MDEQ permits.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents