Similar Projects
Pedestrian Crossing Improvements at Royalgate and Military Drive
Bidding
San Antonio, TX 78242

Walking Track - Copperfield Elementary School
Post-Bid
Converse, TX 78109

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

New Asphalt Parking Lot at 811 Jackson Street
Results
Less than $88,075 est. value
San Antonio, TX 78200

Storm Sewer System Upgrade
Results
Less than $129,578 est. value
TX

River Walk Improvements Phase VI
Post-Bid
Less than $2,850,000 est. value
San Antonio, TX 78205

Concrete Repair and Replacement
Term Contract
Results
Schertz, TX 78154

Repair and Resurfacing of the Cross Creek Apartments Parking Lot
Post-Bid
San Antonio, TX 78218

Maverick Creek Trail Connection
Results
$1,700,000 est. value
San Antonio, TX 78205

HEB - Turn Lane Improvements
Post-Bid
San Antonio, TX

FY 2020 Flatwork TOC Package 6
Results
$2,500,000 est. value
San Antonio, TX 78205

San Antonio Babcock AO Site Improvement - Parking Lot
Post-Bid
San Antonio, TX 78201

New Asphalt Parking Lot
Results
San Antonio, TX 78212

Expand 2 to 4 Lane with Median, Turn Lane, Bike Lane, Sw
Results
Less than $5,737,152 est. value
TX

Pedestrian Crossings
Results
$125,000 est. value
Leon Valley, TX 78238

Last Updated 06/09/2020 04:04 PM
Project Title

Barbara Drive Drainage Phase 2

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78200   (Bexar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,852,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing outfall at McCullough and install new larger outfall. The existing storm sewer along Barbara Dr. from McCullough to approximately 200 feet south of Oblate will be removed and replaced with new larger storm sewer. New inlets along Barbara Dr. will be installed as well. The street will be entirely reconstructed along with sidewalks and driveways as needed. Also, an alternate, Additive Alternate 1, adds to the scope by including a new storm sewer extending from Barbara Drive up Mountain Top to approximately Melba along with new inlets that will capture street flow before reaching Barbara Drive. Two other alternates are also proposed. Alternate 2, will include that same scope as Base Bid with the exception that the TCP for Phases 1 through 3 will be handled differently. The Base bid will allow for a closure of McCullough up to 90-days. Alternate 2 will require TCP that will provide for McCullough to be open throughout the construction with an additional 20 days of added Contract time. Alternate 3, is the same scope as the Base Bid with the exception that the Contractor will be permitted to provide precast box culvert pieces in-lieu of castin-place box culverts for the entire length of the project up to the transition to the storm sewer to remain..Joint bid: water, sewer, and gas lines will be replaced on the base bid. CPS gas line work only on the additive alternate.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents