Similar Projects
Visual Nurse Call System
Alteration
Bidding
WI

Exhibit Upgrade - MEP
Alteration
Bidding
$442,000 est. value
La Farge, WI 54639

Fire Department Dispatch Console Replacement
Post-Bid
Madison, WI 53704

Immediate Need Fiber Projects
Post-Bid
Madison, WI 53703

Door Control System Replacement
Results
Less than $135,000 est. value
Glendale, WI 53212

Horlick Field Exterior Sound System
Results
Racine, WI 53404

Exhibit Upgrade - GPC
Alteration
Bidding
$442,000 est. value
La Farge, WI 54639

2020 Fire Station Alerting System Installation
Post-Bid
Franklin, WI 53132

Provide, Install, and Maintain a Start a New 1Gb Circuit.
Results
Chicago, IL - Marinette, WI 54143

Fall 2020 Fiber Builds
Post-Bid
Wausau, WI 54403

Middle-Mile Fiber Optic Network/Wide Area Network
Results
Medford, WI 54451

Commercial Internet Service for 115th Fighter Wing
Post-Bid
Madison, WI 53704

Administrative Counter Security Upgrades
Results
Green Bay, WI 54301

Integrated Electronic Security System (ESS)
Post-Bid
Madison, WI

2021 Fiber Projects
Renovation
Results
Madison, WI

Last Updated 12/22/2021 05:04 PM
Project Title

Building Automation System Upgrade

Physical Address View project details and contacts
City, State (County) Oshkosh, WI 54901   (Winnebago County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of the replacement of aging Johnson Controls DDC (Direct Digital Control) controllers and antiquated Barber Colman DDC controllers with new DDC controllers for major HVAC equipment (air handlers, boilers, etc.) Replacement parts for these DDC controllers are becoming obsolete. Also included in the scope is replacing pneumatic damper actuators and pneumatically actuated control valves for the air handlers. Conduit, wiring and panel and field control devices will be reused were possible. While most control dampers will have the ability for reuse, the outside air dampers for several air handling units will be replaced due to their deterioration. Some minor pneumatic controls will remain because of cost and accessibility. Pneumatically actuated smoke dampers will remain and be controlled from the new DDC system. The new Schneider DDC Controls recently installed in Building N Addition will remain. A new Building Automation System front end computer workstation will be provided for Agency access to the new control system. The Guard Towers and Buildings J and L1 are not included in this scope of work as DDC controllers do not exist in those buildings.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents