Similar Projects
Doors Security Corrections
Design
$2,000,000 to $5,000,000 est. value
Chicago, IL 60612

SCADA System Upgrade
Bidding
Evanston, IL

Barrington Road Pedestrian Bridge Access Control System
Bidding
Arlington Heights, IL

Wide Area Network
Post-Bid
Washington, DC

Video Event GPS Recorders
Post-Bid
Schaumburg, IL 60193

Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Results

J063-- Upgrade Alarms/Intrusion Detection System
Results
IL 60141

2020 VDI Server Replacement
Post-Bid
Niles, IL 60714

Model Field Office Fiber Installation
Results
Chicago, IL 60661

RFI - Home Intrusion Detection Systems (CONUS/OCONUS)
Post-Bid

Provide, Install, and Maintain a Start a New 1Gb Circuit.
Results
Chicago, IL - Marinette, WI 54143

SCADA Integration Services
Term Contract
Post-Bid
Chicago, IL

Cisco System Network Equipment and Support
Results
Des Plaines, IL 60016

JPMC OP Audio Visual Equipment
Post-Bid
Chicago, IL

Camera Installation at Uplift High School
Results
Chicago, IL 60640

Last Updated 11/04/2020 12:45 PM
Project Title

Main Street Triangle Parking Structure - Automatic Parking Access Control System

Physical Address View project details and contacts
City, State (County) Orland Park, IL 60462   (Cook County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project proposes to provide a complete design, provide all required equipment (hardware and software), delivery, labor, and install a complete PACS system at the Village owned parking structure. The following items must be included in this project: 1. Two automatic parking entry gates with gate arms 2. Two automatic parking exit gates with gate arms 3. Two intercoms at the entry lanes 4. Two intercoms at the exit lanes 5. A master intercom at Village’s Police Department (PD) 6. Toggle switches at the PD to operate individual gate arms 7. Four additional gate arms with required hardware 8. Three-loop vehicle detection system imbedded in the concrete pavement 9. Required conduits for adding future revenue control system using cash, credit, and/or proximity card system 10. All other hardware, software, and other equipment required for a complete functional system 11. 12-month warranty on the entire system

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents