Similar Projects
Z--Romo HQE Waterline Rehab Phase 7 & 8
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Estes Park, CO

Safe Water Action Program General Contractor
Infrastructure
Bidding
Fort Collins, CO

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$300,000 to $400,000 est. value
Estes Park, CO 80517

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

HPCC, Water Line Replacement Project
Results
$600,000 to $650,000 est. value
Fort Collins, CO 80525

Prospect Offsite Water Lines
Infrastructure
Post-Bid
$3,500,000 to $4,500,000 est. value
Fort Collins, CO

Horsetooth Reservoir Inlet Bay Waterlines
Results
Less than $200,000 est. value
Fort Collins, CO 80526

PVC Bend
Infrastructure
Post-Bid
Fort Collins, CO

South Campus Raw Water Expansion
Results
Fort Collins, CO 80526

US 34 - 16" Water Line - Chilson Property
Infrastructure
Post-Bid
Loveland, CO

Buckhorn Creek Waterline Relocation
Results
Masonville, CO

27-Inch Poudre Canyon Raw Waterline
Results
Fort Collins, CO

Water Materials
Results
Less than $40,000 est. value
Loveland, CO

Construction Contractor for Water and Wastewater Treatment Facilities
Results
Fort Collins, CO

Last Updated 02/10/2022 05:56 PM
Project Title

24-lnch PVC Southeast Waterline Phase 1

Physical Address View project details and contacts
City, State (County) Loveland, CO   (Larimer County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City intends to review and analyze the SOQ’s and prepare a list of pre-qualified contractors for bidding the construction work for the horizontal directional drilling of approximately 625 feet of 24-inch fusible PVC pipe under the Big Thompson River, and the Guided Auger Boring and installation of 150-feet of 36-inch steel casing under the Farmers Ditch for the SE 24-Inch PVC Southeast Waterline Phase 1 Project. The pre-qualification list will be valid for this project only. The pre-qualified list for each of the trenchless methodologies will be able to submit sub-contractor bids to a list of pre-qualified general contractors responsible for the installation of the remainder of the 24” PVC waterline utilizing traditional open cut methods.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents