Similar Projects
5th Street & Life Science Center Tunnels Water Main Replacement
Infrastructure
Design
$29,626,148 est. value
Columbia, MO

General Site East Campus Utility Improvements
Infrastructure
Design
Columbia, MO

Downtown Improvements Phase 1 and Phase 2
Infrastructure
Bidding
New Haven, MO

Salisbury Road Water Main Replacement
Infrastructure
Bidding
Independence, MO

Valve Testing and Repairs
Term Contract
Post-Bid
Columbia, MO

Butterfly Valves and Flanges
Post-Bid
Saint Louis, MO

Water System Improvements
Results
Milan, MO

2021 Water System Improvements
Results
Jefferson City, MO

Electrical and Waterline Installation
Term Contract
Design
$250,000 to $500,000 est. value
Saint Charles, MO 65355

Truman Road Water Main Replacement
Infrastructure
Bidding
Independence, MO 64056

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Water Main Replacement in the Area of Booth Avenue to Willow Avenue, East 28th Terrace to East 50th Street
Results
Kansas City, MO 64129

Road Bores for I-70 and County Road 269
Infrastructure
Bidding
MO

Repair Kits and Knife Gate Valve
Post-Bid
Saint Louis, MO

Supplemental Workforce for Water Distribution System Repairs
Results
Kansas City, MO

Last Updated 03/01/2022 02:20 PM
Project Title

Water System Facility Plan Implementation and East Main Street Concrete Improvements - Phase 2, Project 2C

Physical Address View project details and contacts
City, State (County) Cape Girardeau, MO 63755   (Cape Girardeau County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work in general consists of the following: 1. Approximately 3,845 feet of new water main construction, existing main abandonment, and service transfers on E. Main Street, N. Maryland Street, Bellevue Street, East Washington Street, and North Neal Street. East Main Street: Construction of approximately 1,580 feet of 8-inch water main along East Main Street from Georgia Street to Neal Street, including abandonment of the existing main and service transfers. North Maryland Street: Construction of approximately 380 feet of 8-inch water main along North Maryland Street from East Main Street to East Washington Street, including abandonment of existing main and service transfers. South and North Bellevue Street, East Washington Street, and North Neal Street: Construction of approximately 1,490 feet of 8-inch water main along North and South Bellevue from East Adams Street to East Washington Street, then along East Washington Street to Woodland Drive, then along North Neal Street to Morton Street, including abandonment of existing main and service transfers. 2. Old Cape Road Creek Crossing repairs consisting of bank and stream stabilization, concrete encasement of approximately 22 feet of existing 8-inch sewer pipe, and replacement of approximately 41 feet of existing 6-inch water main with new ductile iron pipe water main. 3. Approximately 300 feet of concrete street replacement, new stormwater structures, removal of existing railroad tracks and other miscellaneous improvements located near the intersection of East Main Street and Maryland Street.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents