Similar Projects
STP Overlay of Elmore Park Road, Old Brownsville Road, Ellendale Road, and Billy Maher Road - 4581 - City of Bartlett
Infrastructure
Conception
$4,708,600 CJ est. value
Bartlett, TN 38134

New High School - Maury County School District
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Columbia, TN 38401

Bottled Blonde / Nashville
New Construction, Infrastructure - 25,000 SF
Design
$20,000,000 CJ est. value
Nashville, TN 37201

Steel Utility Pole Installation
Infrastructure
Design
$90,000 CJ est. value
Forest Hills, TN 37215

12th St Detention Structures
Infrastructure
Bidding
$1,000,000 CJ est. value
Cleveland, TN 37311

Construction of the McCroskey Island WWTP Expansion
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Sevierville, TN 37862

Substation Concrete Work
Renovation, Infrastructure
Sub-Bidding
$95,000 CJ est. value
Mount Pleasant, TN 38474

Home Depot #0702 - Tool Rental Center / Kingsport
Addition, Infrastructure - 5,775 SF
Sub-Bidding
$1,300,000 CJ est. value
Kingsport, TN 37660

Sequatchie County Range Phase I
Post-Bid
TN

Hamblen County Schools 2021 Site Improvements at Two School Sites
Infrastructure
Post-Bid
Morristown, TN 37813

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

Demolition of Aircraft Hangar
Demolition
Results
Knoxville, TN 37920

Bledsoe Fall Creek Falls Fiber Optic Expansion
Renovation
Construction
Pikeville, TN 37367

Red Stag Fulfillment Campus
New Construction - 4,200,000 SF
Construction
$10,000,000 CJ est. value
Sweetwater, TN 37874

RDX Headquarters
New Construction - 11,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Memphis, TN 38118

Last Updated 08/04/2022 01:38 PM
Project Title

Dal Tile Quartz Plant Facility

Physical Address View project details and contacts
City, State (County) Dickson, TN 37055   (Dickson County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the addition and renovations to the existing plant facility. Further scope details have not been provided. As of August 4, 2022, this project is in the early planning stages, and received site plan approval from the Dickson Planning Commission. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents