Similar Projects
Last Updated | 12/19/2022 03:03 PM |
Project Title | Weigh-In Motion Installation |
Physical Address | View project details and contacts |
City, State (County) | Geneva, IL 60134 (Kane County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,228,784 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention Portal, to be received no later than 2:00 p.m on September 15. 2022 The work to be done under this contract shall be started on or about January 16. 2023. All work under this contract shall be completed by Seder:ober 25 7071. The location of services to be performed is the Reagan Memorial Tolway (1-88) between Mile Post 115.4 EB and Mile Post 120.3 WB in DuPage County and Kane County, Illinois. The scope of the work shall consist of the Installation of two (2) VVVIM stations. the installation of new conduit, power conductors, and fiber optic cables, Maintenance of Traffic (MOT) during constriction activities, and civil site improvements. Bidders may be required to be pre-qualified by the Ilinois Department of Transportation (IDOl). IDOTPrequallfication required: OYES ONO If 'NO', Ignore any reference to IDOT Prequatikation within the remainder Of this document. Joint Ventures shall be limited to no more than three (3) individually IDOT pre-qualified members. ithaters are also required to be registered. or submit evidence of apptication, with the Illinois Department of Human Rights (IDHR) There are NO EXCEPTIONS. A completed Questionnaire and a statement of current Contractual obigations on forms supplied by the Ilfinois Totway will be required from the apparent low bidder once the apparent low tickler is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the Wind. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft. certified check or cashier's check drawn on a solvent bank made payable to the Ilinois State Toll Highway Authority. Award of the above contract, if any award be made, wai be to the lowest responsive and responsible bidder or bidders. The Tolway reserves the right to reject any and all bids. to waive technicalities, or cancel the solicitation. If yes, BEP Goal Percentage: 25.00000 If yes, VBP Goal Percentage: 3.00000 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |