Similar Projects
UIC Dumpster Pads
Renovation, Alteration
Post-Bid
Chicago, IL 60607

Weir Concrete Repairs
Alteration
Post-Bid
IL

Concrete at Birch Park
Results
Hoffman Estates, IL 60169

Concrete at Bridges Driving Range
Results
Arlington Heights, IL

Advanced Technology Precast Concrete Hollow Core Planks
Alteration
Post-Bid
Grayslake, IL 60030

2021 ADA Accessibility Concrete
Term Contract
Results
$41,070 est. value
Geneva, IL

Exterior Concrete Replacement Phase III
Alteration
Post-Bid
Chicago Heights, IL

Removal and Reconstruction of the Concrete Retaining Wall
Alteration
Results
Springfield, IL

Concrete Repair Contract-2021
Alteration
Post-Bid
Peoria, IL 61640

2020 Concrete Repairs
Alteration
Results
$100,000 est. value
Oak Lawn, IL

Oakwood Terrace Baths Improvements
Infrastructure, Alteration
Post-Bid
Alton, IL 62002

Basketball Court
Alteration
Results
$40,000 est. value
Coal Valley, IL

2021 Concrete Replacement
Alteration
Post-Bid
Columbia, IL

IVHM FY22 Concrete
Alteration
Results
Manteno, IL 60950

Concrete Work and Trench Repair
Infrastructure, Alteration
Post-Bid
Danville, IL

Last Updated 12/19/2022 03:03 PM
Project Title

Weigh-In Motion Installation

Physical Address View project details and contacts
City, State (County) Geneva, IL 60134   (Kane County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,228,784 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention Portal, to be received no later than 2:00 p.m on September 15. 2022 The work to be done under this contract shall be started on or about January 16. 2023. All work under this contract shall be completed by Seder:ober 25 7071. The location of services to be performed is the Reagan Memorial Tolway (1-88) between Mile Post 115.4 EB and Mile Post 120.3 WB in DuPage County and Kane County, Illinois. The scope of the work shall consist of the Installation of two (2) VVVIM stations. the installation of new conduit, power conductors, and fiber optic cables, Maintenance of Traffic (MOT) during constriction activities, and civil site improvements. Bidders may be required to be pre-qualified by the Ilinois Department of Transportation (IDOl). IDOTPrequallfication required: OYES ONO If 'NO', Ignore any reference to IDOT Prequatikation within the remainder Of this document. Joint Ventures shall be limited to no more than three (3) individually IDOT pre-qualified members. ithaters are also required to be registered. or submit evidence of apptication, with the Illinois Department of Human Rights (IDHR) There are NO EXCEPTIONS. A completed Questionnaire and a statement of current Contractual obigations on forms supplied by the Ilfinois Totway will be required from the apparent low bidder once the apparent low tickler is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the Wind. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft. certified check or cashier's check drawn on a solvent bank made payable to the Ilinois State Toll Highway Authority. Award of the above contract, if any award be made, wai be to the lowest responsive and responsible bidder or bidders. The Tolway reserves the right to reject any and all bids. to waive technicalities, or cancel the solicitation. If yes, BEP Goal Percentage: 25.00000 If yes, VBP Goal Percentage: 3.00000

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents