Similar Projects
Stair Replacement, Barre Falls Dam, Barre, MA
Term Contract
Design
Barre, MA 01005

HVAC System / Exhaust Fans Repair Services - Multiple Buildings
Term Contract
Bidding
MA

Siding Replacement
Alteration
Bidding
$130,900 est. value
Topsfield, MA 01983

Almy's Clock Restoration
Post-Bid
Less than $40,000 est. value
Salem, MA

Air Vent Cleaning of Aviation Hangars
Post-Bid

Ionizers Project HVAC HS/MS Building
Results
Less than $30,000 est. value
Ipswich, MA

On-Call Heating, Ventilation and Air Conditioning (HVAC) Services
Results
Less than $50,000 est. value
Andover, MA 01810

Bathroom Sink Replacement
Alteration
Bidding
$22,360 est. value
Essex, MA

HVAC and Mechanical Products
Term Contract
Post-Bid

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Fox Center Community Action for HVAC System Replacement
New Construction, Demolition
Post-Bid
Haverhill, MA 01830

RTU Replacement
Results
Less than $110,000 est. value
Lawrence, MA 01840

Essex County H.O.C. 80 Bed and Voc Tech Buildings Facade/HVAC
Post-Bid
Less than $3,155,494 est. value
Middleton, MA

Fan Coil Unit Replacement at Searles Building
Results
Less than $450,000 est. value
Methuen, MA 01844

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Last Updated 04/04/2022 09:56 AM
Project Title

Town Hall Weatherization and Insulation

Physical Address View project details and contacts
City, State (County) Rowley, MA 01969   (Essex County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The building has minimal insulation and inefficient heating./cooling systems (HVAC). In addition, the existing boiler is nearing the end of its functional life. Prior to replacing/upgrading the HVAC, the Town Hall building envelope needs to be weatherized and insulated.

Details

Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents