Similar Projects
Preservation Square Phase 2A - Site Prep Package
Renovation
Post-Bid
Saint Louis, MO 63106

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Sitework Services
Term Contract
Results
Columbia, MO

Water Storage Tank Maintenance and Lindenwood New Tank Interior Renovation
Results
Saint Charles, MO

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Excavating and General Maintenance Services
Term Contract, Infrastructure
Post-Bid
Sparta, MO

Sunset Elevated Tank Replacement
Results
Saint Louis, MO 63127

Eastowne Business Park - Mass Grading
Infrastructure
Post-Bid
Saint Joseph, MO

Weise House in Street Ferdinand Park Basement Work and Grading
Infrastructure
Results
Florissant, MO

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

North Elevated Water Tower Valve Vault Replacement
Infrastructure
Results
Kirksville, MO

Riverside Redx CID Site Improvements Lot 2 And Riverside Redx Site Improvements Lot 1
New Construction, Alteration - 62,497 SF
Post-Bid
Riverside, MO 64150

Gateway Arch National Park Site Improvements
Infrastructure
Results
Saint Louis, MO

Land Reutilization Authority Redevelopment Proposals
Infrastructure
Post-Bid
Saint Louis, MO 63107

Last Updated 08/30/2022 05:33 AM
Project Title

Elevated Water Storage Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Doniphan, MO 63935   (Ripley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of the Highway 142 Elevated Water Storage Tank Rehabilitation (including abrasive blast cleaning and recoating of both the interior and exterior of the tank, as well as other miscellaneous repairs) construction. The scope of work consists of elevated water storage tank rehabilitation (including abrasive blast cleaning and recoating of both the interior and exterior of the tank, as well as other miscellaneous repairs) construction.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents