Similar Projects
SUEZ Water Eckerson Well
Alteration
Bidding
Airmont, Pomona, Spring Valley, NY

General Pump / Motor repairs and Maintenance
Infrastructure
Bidding
Merrick, NY

Worthington Pump Rebuild at Water Pollution Control Facility
Post-Bid
Williamsville, NY 14221

SPC Building Hot Water Circulation Pumps at the Salt Point Center
Post-Bid
Poughkeepsie, NY 12601

Replacement of Duplex Sump Pumps at School 23
Results
Yonkers, NY 10701

Water System Improvements - Contract 3 - Well Development
Results
Less than $135,000 est. value
Cleveland, NY 13042

Green Lane Booster Pump Station
Infrastructure
Bidding
$200,000 est. value
Bedford Hills, NY 10507

Provide Servicing and Repair of Water Pumps at Various PRC Facilities
Post-Bid
Croton-on-Hudson, Mount Vernon, New Rochelle, Rye, Tuckahoe, White Plains, Yonkers, Yorktown Heights, NY 10805

Test Well Drilling
Results
West Chazy, NY 12992

Warner Road and Bowmansville Pump Stations Valve Installation Contract No 58
Infrastructure
Bidding
$400,000 est. value
Buffalo, NY

City of Batavia Well C Expansion Contract A: Well Drilling
Post-Bid
Batavia, NY

Water Pump and Motor Maintenance and Repair
Term Contract
Results
Yonkers, NY 10703

Effluent Pumps for the Huntington Opening Sewage Treatment Plant
Infrastructure
Bidding
Huntington, NY

Repair/Replace Circulating Pumps
Term Contract
Post-Bid
Rome, NY 13441

Furnish Fairbanks Morris Pump Rehabilation and Replacement as Specified
Results
Syracuse, NY 13204

Last Updated 04/25/2022 07:14 AM
Project Title

Pottersville Well 2 Improvements

Physical Address View project details and contacts
City, State (County) Pottersville, NY 12860   (Warren County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of work including all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of work shown on the plans and described in these specifications including, but not necessarily limited to the following: new well #2 casing extension with sleeve and grouting, new well drop piping, well disinfection and testing, new 4" nominal diameter schedule 80 PVC treatment plant piping, valving, flowmeter, and appurtenances, removal and disposal of existing piping and appurtenances, relocation of chemical feed lines with new installation of chemical injection taps, connection of plant piping from the existing well #3, connection of the new plant piping to the existing discharge line located in the water treatment plant pit, pressure and leakage testing of all piping and appurtenances, and disinfection of installed system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents