Similar Projects
Heating System Repair and Replacements
Renovation
Design
$2,000,000 CJ est. value
Hartford, WI 53027

Pickle Pond Remedial and Habitat Design Project
Infrastructure
Bidding
$200,000 CJ est. value
Superior, WI 54880

Mechanical Demolition Project
Demolition, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Milwaukee, WI 53202

Demolish Former Health and Human Services Building Waukesha County
Demolition, Infrastructure
Sub-Bidding
$98,000 CJ est. value
Waukesha, WI 53188

Asbestos, Lead-Based Paint And Hazardous Materials
Renovation
Post-Bid
Milwaukee, WI 53224

Groundwater Sampling Services
Term Contract
Post-Bid
Ashippun, WI 53003

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

West HS Abatement/Demolition
Results
Madison, WI 53726

Dormitory Abatement and Demolition
Term Contract, Demolition, Infrastructure
Construction
$1,138,000 CJ est. value
Eau Claire, WI 54701

Convert Vehicle Storage Bays to Heated Workspace
Renovation
Construction
$112,090 CJ est. value
Delafield, WI 53018

Snow Plowing/Removal
Term Contract
Sub-Bidding
Peshtigo, WI 54157

Mold Remediation
Term Contract
Post-Bid
Milwaukee, WI

2021 Time & Material Parks Facilities
Term Contract
Results
Milwaukee, WI

Fuel Storage Tank Demolition
Demolition, Infrastructure
Construction
$37,135 CJ est. value
Wausau, WI 54401

Mechanical Demolition Project
Demolition, Infrastructure
Sub-Bidding
$80,000 CJ est. value
Milwaukee, WI 53202

Last Updated 10/10/2022 01:09 PM
Project Title

Abatement and Razing Services for Quarry Lake Park Beach House

Physical Address View project details and contacts
City, State (County) Racine, WI 53404   (Racine County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $98,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

RACINE COUNTY through its duly authorized representatives, reserves the right to reject any or all bids, waive all technicalities, and choose the offer deemed most advantageous to Racine County. All bidders by submitting their bids agree to abide by the rules, regulations and decisions of Racine County. Duane McKinney Racine County Purchasing Manager 1. Provide Labor, Material, Permits and Hauling for all ACM material removal (following all local, state & federal regulations) 2. Erosion/water shed Control of Site for Demolition 3. Disconnection of Gas, Electric, Water and Sanitary Lift Station to Building 4. Asphalt Parking lot and Sidewalk Protection from Equipment 5. Complete Dismantling/Demolition of Quarry Pavilion/Bathrooms and Storage Building 6. Removal of Landscaping around Building (large trees to be protected) 7. Removal of concrete entry walkway to building (sidewalk connected to parking lot to remain) Work shall be completed 90 days after contract has been awarded 8. Removal of concrete picnic table area (north and west of building) (2 concrete slabs rows from beach retaining wall to remain) 9. Site to be grade finished and hay and seeded 10.Asbestos report included 11.Soil Boring Sample Report – Available by Request

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents