Similar Projects
2020 Concrete Rehab-Ada Improvements
Post-Bid
$370,000 to $390,000 est. value
Wheat Ridge, CO

W-Line Shared Use Path - Oak to Kipling and Zephyr to Wadsworth
Post-Bid
Lakewood, CO 80228

Concrete ADA Compliant Ramps at Campbell Cottages
Term Contract
Results
Arvada, CO 80005

Parking Lot Maintenance
Results
Golden, CO 80401

Pierce and 17th Avenue Crosswalk
Post-Bid
Lakewood, CO 80226

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

Sidewalk Improvements on 13th Avenue (Lamar Street West) and Wadsworth Boulevard (Mansfield Avenue South)
Post-Bid
Lakewood, CO 80226

Union and 6th Avenue On-Ramp Median Reconstruction
Results
Lakewood, CO 80226

Improvements of Walkways, Curbs, Trails and Parking Lots at Five Parks
Post-Bid
Evergreen, CO 80439

West 50th Avenue Sidewalk (SRTS) Between Fairmount Elementary & Mcintyre Street
Results
Golden, CO 80419

Climbing Access Trail Construction
Post-Bid
CO

Open Space North 40 Parking Lot Asphalt Replacement
Term Contract
Results
Less than $50,000 est. value
Golden, CO 80401

2021 Concrete Rehab-Ada Improvements
Post-Bid
$200,000 to $250,000 est. value
Wheat Ridge, CO

2020 Safe Routes to School - Pierce Street Project
Results
$300,000 to $350,000 est. value
Edgewater, CO 80214

Sidewalk Elevation Differential Mitigation (Sawing)
Post-Bid
Lakewood, CO

Last Updated 04/14/2021 03:33 PM
Project Title

Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Lakewood, CO 80227   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $45,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work performed by the contractor shall include, but not be limited to, all labor, tools and material to prepare surfaces and pave parking lot as described below: The site location is 3720 S. Carr St. Lakewood, CO Subgrade Preparation (New Parking Lot Addition): Excavation existing vegetation and soils to approx. 2-4 inches in depth and dispose of offsite. Fine grade and compact per industry standards. Install 4” asphalt pavement. Asphalt Overlay (Existing Parking Lot): Clean existing asphalt thoroughly and apply CSS-IH tack coat to ensure bonding. Install 3” asphalt paving. Re-stripe entire parking lot with spaces for 45 vehicles.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents