Similar Projects
HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

Cemline V200swh624, Steam Powered Water Heater Brand Name or Equal at US Merchant Marine Academy (USMMA)
Post-Bid
Great Neck, NY 11024

Seasonal Inspection, Diagnostic and Repair Services for the Hot Water Boilers at Fulton Hall
Term Contract
Post-Bid
Kings Point, NY 11024

Seasonal Inspection, Diagnostic and Repair Services for the Hot Water Boilers at Delano Hall
Term Contract
Post-Bid
Kings Point, NY 11024

Vestibule and Reading Room Window Replacement and HVAC Upgrades
Alteration
Post-Bid
$350,050 est. value
Bellmore, NY 11710

Laundry Exhaust Duct Cleaning
Alteration
Post-Bid
NY

Tully Park HVAC Improvements
Alteration
Post-Bid
New Hyde Park, NY 11040

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Mechanical System Upgrade for Firing Range
Term Contract
Post-Bid
Great Neck, NY 11024

New HVAC System Equipment and Installation for T.O.H. Laboratory
Alteration
Post-Bid
Hempstead, NY

Replacing Steam Condensate Pipes
Term Contract
Results
Kings Point, NY 11024

Heating and Air Conditioning Periodic Maintenance
Term Contract
Bidding
Oyster Bay, NY

A/C Units Maintenance
Term Contract
Post-Bid
Hempstead, NY

HVAC Service
Term Contract
Bidding
Oyster Bay, NY

Maintenance and Repair of Pneumatic and HVAC System and ANCI
Alteration
Bidding
NY

Reported 09/11/2021 12:00 AM
Project Title

Plainview Hospital ICU Chiller CM Proposals

Physical Address View project details and contacts
City, State (County) Plainview, NY 11803   (Nassau County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected October 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

The 1st floor ICU space consists of 17 patient rooms and 4 isolation rooms at the perimeter with support space rooms at the center of the suite. Each surveyed patient room contains a supply diffuser and two return diffusers to serve the room. The space is currently served by AHU-3, an existing York recirculating air handler located on the roof directly above the ICU space. The supply duct from the air handler splits on roof to run down two risers to serve the space, one at the north of the suite and another towards the midpoint of the space. The return duct riser runs up the aforementioned north riser from the space. Airflow modulation occurs at the unit itself as the space is a constant volume Currently there are (2) two older vintage 80 ton Carrier chillers. Located at grade along the north side just east of the north wing. In the same fenced in area outside alongside the chillers are (2) existing primary pumps, three (3) secondary pumps, plate and frame heat exchanger, buffer tank and expansion tank. The existing CHW piping runs up the north side inside of the building to the roof to two units on the roof of the north building. This piping is undersized to serve the new AHU load. There are (2) newer 160 ton Trane chillers adjacent to the chillers noted above. The Trane units are piped both down to serve the fan coil units and other hospital distribution. These two chillers are configured in an N+1 configuration. Both of these chillers are provided with emergency power.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents