Similar Projects
Waste Water Treatment Facility Electrical and HVAC Refurbishment - City of Algoma
Renovation
Conception
$425,000 CJ est. value
Algoma, WI 54201

Chaff System Improvements at Jones Island Water Reclamation Facility
Renovation
Bidding
$80,000 CJ est. value
Milwaukee, WI 53207

Jones Island Water Reclamation Facility Cabinet Fans #1 and #2 Replacements
Renovation
Bidding
$400,000 CJ est. value
Milwaukee, WI 53207

WWTF Renovation
Renovation
Post-Bid
Hatley, WI 54440

Osmosis Plant at the Calumet County Park
New Construction
Post-Bid
Hilbert, WI 54129

CSTP 5 Improvements
Results
Superior, WI

Wastewater Treatment Facility Upgrade
Renovation
Results
$1,000,000 est. value
Blue River, WI

Bernatello's Waste Water Treatment Plant
New Construction, Infrastructure - 3,375 SF
Pending Verification
$2,800,000 CJ est. value
Kaukauna, WI 54130

Jones Island Water Reclamation Facility Bldg. 299B Main Gate Replacements
Renovation
Bidding
$90,000 CJ est. value
Milwaukee, WI 53207

Dryer Indefinite Quantity Services
Term Contract
Post-Bid
Milwaukee, WI 53207

Variable Frequency Drive for Wastewater Treatment Plant
Results
Antigo, WI

Sodium Hypochlorite Storage Tank 2 Repairs at the Jones Island Water Reclamation Facility
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Milwaukee, WI 53207

West Plant Return Activated Sludge Channel Repair
Renovation
Post-Bid
Milwaukee, WI

2021 WWTF Upgrade
Results
Merrillan, WI

Proposed UV Disinfection Upgrade - Wastewater Treatment Facility
Renovation, Infrastructure
Bidding
$70,000 CJ est. value
Shullsburg, WI 53586

Last Updated 10/31/2022 06:06 PM
Project Title

Turtle Lake Membrane Bio-Reactor - Village of Turtle Lake

Physical Address View project details and contacts
City, State (County) Turtle Lake, WI 54889   (Barron County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $5,700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 31, 2022, an engineer has been selected and this project is in the final planning phase. It is anticipated bidding will commence late December 2022 or early January 2023. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Request Category Code: Wastewater Treatment Description: The Village of Turtle Lake has elected to pre-select an equipment supplier for a Membrane Bio-Reactor System, included as part of the Wastewater Treatment Plant (WWTP) Upgrade with Membrane Bio-Reactor (MBR) project. The selection procedure will be used to determine the most responsible qualified supplier that will be collaborated with during design and listed in the construction contract specifications for the Membrane Bio-Reactor System equipment. Paper/hard copy packages are to be delivered to the Turtle Lake Village Hall at the address listed below. Deliver three (3) copies of the qualification package to the following address: Turtle Lake Village Hall Attn: Cory Davis 114 Martin Ave East Turtle Lake, WI 54889

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents