Similar Projects
Power Systems Study
Alteration
Bidding
Atlanta, East Point, GA 30344

Building Inspection Services
Post-Bid
Thomaston, GA 30286

Roadway Testing Technicians Districts 1, 3 and 6
Post-Bid
$25,000 to $26,000,000 est. value
Cartersville, Gainesville, Thomaston, GA 30501

Provide Pavement Condition Index Ratings
Term Contract
Results
Cumming, GA 30040

Backflow Testing
Results
Less than $7,500 est. value
Douglasville, GA

Annual Elevator Inspection Services
Post-Bid
Cumming, GA

Cable Stay Bridges Services
Term Contract
Results
$25,000 to $5,000,000 est. value

Maintenance Engineering and Inspection Services
Post-Bid
Gainesville, GA 30501

Maintenance Engineering And Inspection Services-D7
Term Contract
Results

Construction Materials Testing, Inspections And Soil Borings Annual Contract
Term Contract
Post-Bid
GA

Construction Engineering and Inspections for Street Resurfacing
Term Contract
Results
Stonecrest, GA

Exploration and Construction Testing Services
Post-Bid
Augusta, GA

Professional Building Plan Review And Inspection
Results
Winder, GA

Pavement Inspection Services
Post-Bid
Fayetteville, GA

Construction Inspection and Testing Services for the New West Laurens Middle School
Post-Bid
Dublin, GA 31021

Reported 10/27/2021 12:00 AM
Project Title

Special Inspections and Storm Water Monitoring

Physical Address View project details and contacts
City, State (County) Cartersville, GA   (Bartow County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The New cartersville primary school project consists of new 224,000 S.F. primary school with a two story commons area connected one story Pre-K and Kindergarten classroom building as well as three story 1st grade to 3rd grade classroom buildings. Construction will be steel frame with CMU and brick and adhered natural stone exterior cavity walls with EiFS accents.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents