Similar Projects
Tactical Equipment Maintenance Facility, Fort Carson
New Construction
Design
$10,000,000 to $25,000,000 est. value
Colorado Springs, CO 80902

Monument Industrial
New Construction - 136,000 SF
Bidding
Monument, CO 80132

Transit Campus Expansion Bus Storage Construction
New Construction - 71,218 SF
Post-Bid
$7,000,000 to $13,000,000 est. value
Colorado Springs, CO 80903

Bijou Street Maintenance Site
Post-Bid
Less than $7,750,000 est. value
Colorado Springs, CO

Sand Shed Emergency Repair
Results
$150,000 to $200,000 est. value
Colorado Springs, CO 80903

Furnish and Install Drake Tngg Pre-Engineered Shop-Fabricated Metal Building
New Construction
Results
Colorado Springs, CO 80903

U-Haul Valley Hi
New Construction, Renovation - 85,000 SF
Construction
$7,324,770 est. value
Colorado Springs, CO 80910

In-N-Out Burger Distribution Center & Office Building
New Construction - 197,900 SF
Construction
$10,000,000 est. value
Colorado Springs, CO

U-Haul
New Construction - 8,245 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Colorado Springs, CO 80919

Sheet Metal Building for Forestry Operations Center
Post-Bid
Colorado Springs, CO 80903

Amazon Warehouse
New Construction - 3,953,500 SF
Construction
Colorado Springs, CO

Construction of a New Metal Building
New Construction
Post-Bid
Fountain, CO

Zeppelin 3 and 4
New Construction - 240,240 SF
Construction
$9,722,120 est. value
Colorado Springs, CO 80916

Centralized Water Treatment Project
Construction
Colorado Springs, CO

UPS Parcel Distribution Facility
New Construction - 98,291 SF
Construction
Monument, CO

Last Updated 09/16/2021 11:26 AM
Project Title

Water Treatment Plant 3/9 Modifications

Physical Address View project details and contacts
City, State (County) Monument, CO 80132   (El Paso County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of an approximately 2,700 square feet pre-engineered metal building (PEMB) to expand the existing Water Treatment Plant (WTP) 3/9 building and adjacent WTP 8 building, located at 225 Beacon Lite Road, Monument, Colorado, 80132. This bid is to select the PEMB supplier to furnish and erect the metal building portion of the project. A general contractor for the overall WTP 3/9 Modifications project will be selected through a separate upcoming bid process.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents