Similar Projects
Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

Bridgeport - Boscobel Const / Sanitary Water / MISC
Infrastructure
Design
$2,000,000 CJ est. value
Juneau, WI 53039

Waupun Central Generating Plant (CGP) Water System Improvements - GPC
Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - GPC
Infrastructure, Renovation
Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - MEP
Infrastructure, Renovation
Sub-Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Waupun Central Generating Plant (CGP) Water System Improvements - MEP
Infrastructure, Renovation
Sub-Bidding
$6,000,000 CJ est. value
Waupun, WI 53963

Bobolink Road
Infrastructure
Post-Bid
Lowell, WI

Snow Plowing/Winter Maintenance
Term Contract
Post-Bid
Kekoskee, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Road Improvements
Results
Lomira, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Oconomowoc - Mayville RR OPS / Crossing Repair / Resurface
Infrastructure
Design
$250,000 CJ est. value
Iron Ridge, WI 53035

Lowell - Hartford
Infrastructure
Bidding
$12,000,000 CJ est. value
Clyman, WI 53039

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Last Updated 02/06/2023 06:04 PM
Project Title

Cityview 2nd Addition - Phase 1

Physical Address View project details and contacts
City, State (County) Horicon, WI 53032   (Dodge County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,754,071 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 6, 2023, construction commenced shortly after being awarded and is expceted to be completed in 2023, however, an exact timeline for construction has not been confirmed. The principal items for which proposals are invited are: 2,600 LF Sanitary Sewer Main and Laterals, 6-Inch to 8-Inch PVC 650 LF Sanitary Sewer Forcemain, 4-Inch PVC 1 LS Sanitary Sewer Lift Station 2,300 LF Water Main, 8-Inch PVC 950 LF Water Service Pipe, 1-1/4-Inch Copper 2,800 LF Storm Sewer Main, 12-Inch to 20-Inch 1 LS Storm Pond 3,000 LF Concrete Curb and Gutter, 30-Inch 12,000 SF Concrete Sidewalk, Carriage 4-Inch to 6-Inch 5,700 TN Aggregate Base Dense, 3-Inch to 3/4-Inch 1,500 TN Hot Mix Asphalt Pavement, 4-Inch 7,000 SY Landscape Restoration. Bids shall be accompanied by a Certified Check or Bid Bond payable to the City of Horicon in an amount equal to 5% of the Bid, as a guarantee that if the Bid is accepted, the Bidder will execute and file the Contract, the Contract Performance Bond and Payment Bond, and the Insurance Certificate(s), as required by the Contract Documents, within 15 days after the Notice of Award of the Contract by the City of Horicon Failure on the part of the Bidder to do so will result in forfeiture of the Bidder's Certified Check or Bid Bond to the City of Horicon as liquidated damages. The City of Horicon reserves the right to accept or reject any or all bids and to waive any informalities in bidding. No bid may be withdrawn for a period of 60 days after the scheduled time for opening bids. Letting of the contract is subject to Sections 61.54 and 62.15 of the Wisconsin Statutes as applicable. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents