Similar Projects
Design-Build Edinburg Pump Station Levee Rehabilitation
Design
$1,000,000 to $5,000,000 est. value
Hidalgo, TX

Booster Pump Replacement
Bidding

Booster Pump Replacement
Bidding

Sabine River Authority Pump Station and Pipeline - Bid Package 5.03 - Pump Station Mechanical Construction Bid Package
Post-Bid
Orange, TX 77631

Marina Lift Station Cover
Post-Bid
Athens, TX 75751

Construction Management Services
Results
Arlington, TX

Interim Lift Station and Sanitary Sewer Collection Facilities to Serve the Denver Miller Residential Area Tract
Results
TX

North 2 (11.8 MGD) Pump Station
Construction
$4,572,090 to $5,207,102 est. value
El Paso, TX 79925

Bear Creek SUD Pump Station 2 Improvements
Bidding
Lavon, TX 75166

Pump Station 3 Site Improvements
Post-Bid
$4,000,000 to $6,000,000 est. value
TX 78746

Third Storm Water Pump Station
Results
$480,000 est. value
Sugar Land, TX 77479

Lift Station 23 Rehabilitation Project
New Construction
Bidding
$680,000 est. value
Texas City, TX 77591

Community ISD Lift Station Upgrades
Post-Bid
Nevada, TX 75173

Plant 1 Improvements Contract 2 High Service Pump Station
Results
$300,000 est. value
Tyler, TX 75706

Harvest Green Lift Station No. 3 Expansion
New Construction
Bidding
TX

Last Updated 08/12/2020 03:42 PM
Project Title

Lake Arlington Raw Water Pump Station Shared Operations Improvements

Physical Address View project details and contacts
City, State (County) Arlington, TX 76013   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $17,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate the Lake Arlington Raw Water Pump Station with new pumps, motors, drives, electrical equipment, and appurtenances. Supply and install three pre-selected pumping units for the City of Arlington. Supply and install three pumping units for the Trinity River Authority. Expand the existing electrical building. Install 60-inch yard pipe and appurtenances at the Lake Arlington Pump Station Site. Install a flow meter with vault and improvements on the 54-inch raw water pipeline at Pierce Burch Water Treatment Plant. Various site, civil and roadway improvements.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents