Similar Projects
Civic Campus HVAC System Upgrade Project - Rebid
Renovation
Design
$80,000 CJ est. value
Pacific, WA 98047

J045 Plumbing and HVAC Maintenance, Department of Veterans Affairs, Puget Sound Campuses, WA
Term Contract
Sub-Bidding
$7,000,000 CJ est. value
Seattle, WA 98108

Bathroom Fan Replacement Gilman Square
Renovation
Sub-Bidding
$69,592 CJ est. value
Issaquah, WA 98027

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Haller Elementary HVAC Upgrades
Alteration
Post-Bid
Bellevue, WA 98008

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

OMFC LCC HVAC Replacement
Alteration
Results
$2,647,102 est. value
Seattle, WA 98134

HVAC Replacement Rooftop Heat Pump and A/C Units
Renovation
Construction
$132,868 CJ est. value
Renton, WA 98057

South Shore K-8 Chiller Replacement
Renovation
Construction
$225,350 CJ est. value
Seattle, WA 98118

Gatewood ES Exterior Door and HVAC Upgrades
Alteration
Post-Bid
$2,100,000 to $2,400,000 est. value
Seattle, WA 98136

Air Terminal Units (VAV Boxes) Replacement Project
Alteration
Results
$250,000 to $500,000 est. value
Auburn, WA 98092

Hazen High School - Domestic Water Entrance and Water Heater Upgrades
Renovation
Construction
$255,137 CJ est. value
Renton, WA 98059

Sea ATCT Base Building Boiler Flue Replacement
Term Contract
Post-Bid
$30,000 to $45,000 est. value
Seatac, WA 98158

Architecture Hall HVAC Improvements
Alteration
Results
$885,000 est. value
Seattle, WA 98195

Capital Hill Roof and HVAC Replacement
Alteration
Post-Bid
$875,000 to $1,007,500 est. value
Seattle, WA 98102

Last Updated 03/08/2023 08:06 AM
Project Title

Mount Baker Middle School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Auburn, WA 98002   (King County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The single Contract which includes Mechanical and Electrical Work required to replace the boilers and pumps at Mount Baker Middle School. The project consists of replacement of two aging gas fired hot water heating boilers, pumps and system appurtenances with new owner provided condensing boilers and pumps. Scope of testing shall include entire HVAC installation. The project description is provided for reference only. contractor shall refer to the construction documents including drawings for the detailed scope of work. in case of conflict between this description, the drawings, the specifications, the most stringent condition shall apply. The mount baker middle school boiler replacement scope includes but is not limited to the following tasks: 1. Demolish existing boiler, circ pump and appurtenances. revisions 2. Provide new condensing gas-fired boilers, pumps, and appurtenances. bid set 2/14/2023 3. Provide new gas regulator and gas piping connections to new boiler. 4. Provide controls and electrical power connections to new equipment. 5. Provide anchorage for new boilers and supporting structural calculations Site Directions: Mount Baker Middle School 620 37th Street SE Auburn, WA 98002 Substantial Completion Shall be no later than August 18, 2023. Final Completion Shall be no later than September 1, 2023.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents