Similar Projects
Capitol Building Redevelopment
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC

St Elizabeths East - Phase II
New Construction - 256,000 SF
Conception
$10,000,000 CJ est. value
Washington, DC

Randall School Redevelopment Phase I
New Construction, Renovation - 32,707 SF
Design
$65,000,000 est. value
Washington, DC 20024

Beacon Hotel
Renovation
Design
Washington, DC 20036

The Tabernacle
Renovation - 17,600 SF
Bidding
Washington, DC 20024

Silver Diner - Ballpark
Build-Out - 8,000 SF
Sub-Bidding
Washington, DC 20003

Meininger Hotel
New Construction - 74,500 SF
Post-Bid
Washington, DC 20001

Meininger Hotel
New Construction - 74,500 SF
Post-Bid
Washington, DC 20001

Canteen Renovation
Renovation - 9,120 SF
Results
$2,000,000 to $2,500,000 est. value
Washington, DC 20571

The Gantry
New Construction - 674,005 SF
Construction
$10,000,000 CJ est. value
Washington, DC 20002

The Wharf Phase II Parcel 10
New Construction - 35,400 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20024

Foxtrot
New Construction
Pending Verification
Washington, DC 20007

Western Market Food Hall
Build-Out - 12,300 SF
Pending Verification
Washington, DC 20006

Buzzard Point - Phase I MASTER PLAN
New Construction - 95,000 SF
Conception
Washington, DC 20003

Lifestyle Hotel
New Construction - 2,765 SF
Design
$500,000 to $1,000,000 CJ est. value
Washington, DC 20001

Reported 06/17/2021 04:48 PM
Project Title

Cambria Hotel

Physical Address View project details and contacts
City, State (County) Washington, DC 20024   (District of Columbia County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Food/Beverage Service, Hotel/Motel
Contracting Method
Project Status Building in Operation as of February 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, New Construction, 1 Hotel/Motel, 9 Stories Above Grade, Renovation 154 Unit(s), Food/Beverage Service, New Construction.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Standard Pattern Wood Trim.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Gypsum Board Fireproofing, Tiling, Acoustical Ceilings, Specialty Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 14 - Conveying Equipment, Commissioning of Conveying Equipment, Commissioning of Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents