Similar Projects
The Oak Development Master Plan
New Construction - 250,000 SF
Conception
Oklahoma City, OK 73112

Industrial Warehouse
New Construction
Conception
Oklahoma City, OK 73105

Camino Del Plaza Drive Professional Offices
New Construction
Design
Edmond, OK 73013

East Hefner Road Mixed Use Development - Master Plan
New Construction
Design
Oklahoma City, OK 73131

Renovate Quesada Gate
Infrastructure
Bidding
$5,000,000 CJ est. value
Oklahoma City, OK 73169

Renovate Quesada Gate
Infrastructure
Bidding
$5,000,000 CJ est. value
Oklahoma City, OK 73169

Pavement Extension, AMP 101, Will Rogers Courts
Post-Bid
Oklahoma City, OK 73108

7-Eleven #46026
New Construction
Post-Bid
Edmond, OK 73012

Street Improvements - Britton Road From Morgan Road to County Line Road
Infrastructure
Results
$2,970,000 est. value
Oklahoma City, OK

Triple X Roadway Construction
Infrastructure
Results
$1,406,497 est. value
OK

15th Street Warehouse And Distribution Center
New Construction - 517,220 SF
Construction
$10,000,000 CJ est. value
Oklahoma City, OK 73128

Integrated Office Building
New Construction - 32,111 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Edmond, OK 73013

Omega Investments Office Building
New Construction - 10,488 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Oklahoma City, OK 73103

Danforth Crossing
New Construction
Pending Verification
Edmond, OK 73025

The Oaks
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Oklahoma City, OK 73131

Last Updated 01/19/2023 02:18 PM
Project Title

Travelers Place Industrial Development

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73131   (Oklahoma County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Fitness Center, Industrial Warehouse, Manufacturing/Processing Plant, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a large gymnasium for recreational uses. The exact scope of the project has not yet been disclosed. As of January 2023, this project did not move forward.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents