Last Updated | 08/10/2022 02:09 PM |
Project Title | Eastanollee Cannery 2022-02 Vertical Retort Replacement |
Physical Address | View project details and contacts |
City, State (County) | Blairsville, GA 30512 (Union County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $135,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Stephens County Schools District is issuing this Request for Proposal (RFP) Cannery 2022-02 to provide interested vendors with sufficient information to enable them to prepare and submit proposals for New Canning Retorts. The start date for this Work will be determined and based on equipment lead times, with the final delivery date to be determined. Pricing shall be included in the Offeror's proposal. All follow-up questions are to be submitted via email to tim.wilbanks@stephenscountyschools.org. Vendor correspondences related to this RFP will only be accepted via email, between June 3, 2022 and June 15, 2022. All emailing shall be directed to tim.wilbanks@stephenscountyschools.org, with the subject line formatted as "RFP Cannery Retort 2022-02" -"Topic/Question"". SCSD reserves the right to accept or reject any or all proposals, parts of proposals, to waive any irregularities or technicalities in any proposal, bidding or evaluation process, and to accept the proposal determined to be in the best interest of the SCSD. The start date for this Work will be determined and based on equipment lead times, with the final delivery date to be determined. Remove and dispose of all equipment that is slated for replacement. o Supply Dixie RDSW-3SS Retort, T-304SS - Qty 5 o Supply 1/2 " Process Steam Regulator 10-50 PSI - Qty 5 o Supply 1/2 " Pipe Line Strainer - Qty 5 o Supply 1/2 " Check Valve - Qty 10 o Supply 3/4 " Check Valve - Qty 5 o Supply Air Regulating Valve Assembly For Retort Package 3 - Qty 5 o Supply Cooling Inlet Water assembly For Pressure Cooling Retort Package 3 - Qty 5 o Supply RRT- Time and Temp Recorder - Qty 1 o Retort Crate T-304 SS - Qty 5 o Retort Separator Sheets - Qty 50 o Crate Dolly - Qty 3 o Supply all materials associated with the installation of the new devices. To include but not limited to electric, steam, water, compressed, air and etc.... |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |