Similar Projects
Wemsing Avenue - City Of Effingham
Infrastructure
Conception
$300,000 est. value
Effingham, IL 62401

East Evergreen Roadway Improvement - City Of Effingham
Infrastructure
Conception
$850,000 est. value
Effingham, IL 62401

Meijer - Oak Point Centre / Effingham
New Construction, Infrastructure - 150,000 SF
Design
$20,000,000 CJ est. value
Effingham, IL 62401

Meijer - Oak Point Centre / Effingham
New Construction, Infrastructure - 150,000 SF
Design
$20,000,000 CJ est. value
Effingham, IL 62401

Pavement Patching - 2023
Infrastructure
Bidding
$300,000 CJ est. value
Effingham, IL 62401

Pavement Patching - 2023
Infrastructure
Bidding
$300,000 CJ est. value
Effingham, IL 62401

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching-2021
Infrastructure
Results
Effingham, IL

Outer Belt West North of Evergreen Pavement Replacement
Infrastructure
Results
$517,648 est. value
Effingham, IL

WestDale Project
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Effingham, IL 62401

Ford Avenue Extension Phase IB - City Of Effingham
Infrastructure
Conception
$1,400,000 est. value
Effingham, IL 62401

Extend Runway 11-29 at Effingham County Memorial Airport - Effingham County
Infrastructure
Design
$3,500,000 CJ est. value
Effingham, IL 62401

2023 Street Resurfacing Program Phase 2
Infrastructure
Bidding
$500,000 CJ est. value
Effingham, IL 62401

New Concrete Parking Area at the Community Park
Infrastructure
Post-Bid
$200,000 est. value
Beecher City, IL

Last Updated 07/21/2023 09:04 AM
Project Title

3rd Street Sidewalk Enhancements

Physical Address View project details and contacts
City, State (County) Altamont, IL 62411   (Effingham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County: Altamont 22-00023-00-SW Removal and reconstruction of 181 feet of 3rd Street sidewalk in the City of Altamont involving: 35 Cubic Yards Trench Backfill 1 Each Inlet and Pipe Protection 10 Ton Aggregate Base Course, Type a 40 Square Yards Portland Cement Concrete Driveway Pavement, 6 Inch 1,136 Square Foot Portland Cement Concrete Sidewalk 4" 87 Square Foot Portland Cement Concrete Sidewalk 6" 24 Square Foot Detectable Warnings 53 Square Yards Pavement Removal 183 Foot Combination Curb and Gutter Removal 1,113 Square Foot Sidewalk Removal 41 Foot Pipe Handrail 1 Each Domestic Meter Vaults to Be Adjusted 1 Each Inlets, Type a, Type 24 Frame and Grate 183 Foot Combination Concrete Curb and Gutter, Type B-6.24 173 Foot Storm Sewers, Class B, Type 1 12" 1 Each Storm Sewer Connection 0.25 Acres Seeding, Class 1 (Special) 1 Lump Sum Traffic Control and Protection, (Special) 1 Lump Sum Painting ILDOT: Removal and reconstruction of 181 feet of 3rd Street sidewalk Removal and Reconstruction of 170 plus feet of 3rd Street Sidewalk. Work shall include drainage, grading, storm Sewer, Sidewalk, Erosion Control and seeding

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents