Similar Projects
Top Crop Cultivation Warehouse
New Construction, Addition - 38,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Las Cruces, NM

RV Storage - Albuquerque
New Construction - 650 SF
Design
Less than $500,000 CJ est. value
Albuquerque, NM 87121

Climate Controlled Self-Storage Facility
New Construction
Design
Rio Rancho, NM

Steel Building
New Construction
Bidding
$214,000 est. value
Portales, NM

ARFF Modular/Manufactured Building
New Construction
Post-Bid
Belen, NM 87002

Multi-Use Arena Phase 1A
New Construction
Post-Bid
Grants, NM

Tsankawi Chlorination Building and WP Main Replacement NM4 and East Jemez Road
New Construction - 210 SF
Results
Los Alamos, NM

Farley Fire District Abbott Substation
New Construction - 2,000 SF
Results
$300,000 est. value
Raton, NM 87740

Big Wave Xpress - Storage Building
Addition
Construction
Alamogordo, NM 88310

APS Westside Bus Depot
New Construction - 26,764 SF
Construction
Albuquerque, NM 87121

Monte Sereno
New Construction - 190,700 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Santa Fe, NM 87506

Safe Store Storage - Central Ave
New Construction - 104,440 SF
Pending Verification
Albuquerque, NM 87121

Pods Storage Facility
New Construction - 52,800 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Santa Fe, NM 87501

Wastewater Treatment Plant Expansion 2021
New Construction, Addition - 14,042 SF
Post-Bid
$7,200,000 est. value
Anthony, NM

Design Bid Build Fy20 Nc3 Support War Reserve Material (Wrm), Storage/Shipping Facility, Holloman Air Force Base, Otero County, New Mexico
New Construction, Demolition - 89,945 SF
Results
$10,000,000 to $25,000,000 est. value
NM

Reported 06/24/2022 09:04 AM
Project Title

U-Haul Self Storage / Albuquerque

Physical Address View project details and contacts
City, State (County) Albuquerque, NM 87113   (Bernalillo County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a warehouse / distribution facility in Albuquerque, New Mexico. Conceptual plans call for the construction of a three-story above grade warehouse / distribution facility. Plans call for the construction of a 3 story self storage facility. Further scope details including an exact square footage have not been provided. As of June 23, 2022, this project is in the early planning stages. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, it is expected to be completed by the end of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents