Similar Projects
Kimball Avenue Shared Use Path (Phase 2) - City of South Burlington
Infrastructure, Alteration
Conception
$400,000 est. value
South Burlington, VT 05403

Spear Street Residential Development
Demolition, New Construction, Infrastructure
Conception
$18,900,000 CJ est. value
South Burlington, VT 05403

USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

Extend Taxiway G and Construct New General Aviation South Apron
Infrastructure
Bidding
$600,000 CJ est. value
South Burlington, VT 05403

Old Stage Road Culvert Replacement and Paving
Infrastructure
Bidding
$240,000 CJ est. value
Essex Jct, VT 05452

Vermont Air National Guard Base Replace B-120 Chiller
Renovation, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
South Burlington, VT 05403

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

JOC Order Contracting Region A
Results
$10,000,000 est. value

Founder's Hall Demolition, New Walkways, and Lawn Area
New Construction, Demolition
Construction
$715,000 est. value
Colchester, VT

Hillside at O'Brien Farm
New Construction, Infrastructure - 1,285,000 SF
Pending Verification
$496,500,000 CJ est. value
South Burlington, VT 05403

Williston Road Mixed Use Development
Demolition, New Construction, Infrastructure - 109,629 SF
Pending Verification
$65,000,000 CJ est. value
South Burlington, VT 05403

Aldi - Wright Avenue / Williston
New Construction, Infrastructure - 19,500 SF
Conception
$5,100,000 CJ est. value
Williston, VT 05495

Bridge 31 Street Bridge Repair
Infrastructure
Bidding
$80,000 CJ est. value
Richmond, VT 05477

Last Updated 08/05/2022 04:05 PM
Project Title

RFQ Construction Manager - Public Works Facility

Physical Address View project details and contacts
City, State (County) Milton, VT 05468   (Chittenden County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Miltons current Department of Public Works (DPW) Highway Facility is located on Ice House Road, adjacent to Arrowhead Lake Dam and the Lamoille River. This location provides a centralized site to access the town for general maintenance and snow plowing, however, there are several drawbacks associated with the location and the garage itself. The location is too close to the Lamoille River, and not an ideal location to store salt and liquid chloride for winter operations and maintenance. The building was constructed over 70 years ago, and was never meant to be a DPW facility. The structure is too small to house all of Miltons heavy equipment, does not have a wash down bay, and has numerous other deficiencies. The new facility will be located on a 6.7-acre parcel adjacent to Bombardier Park, off Park Place, and adjacent to the Town of Milton Municipal Complex. See attached draft site plan. On Town Meeting Day 2022, Milton voters passed a $5.5M dollar bond to construct a new public works facility. Additionally, there are ARPA funds and other grants/monies available to assist the town in paying for this project. The project consists of the structural, mechanical, electrical, plumbing, HVAC, etc., design and construction of a new, 30,000 square foot public works building. The town is currently working with Krebs & Lansing Consulting Engineers on geotechnical investigations and site improvements, including bringing water and wastewater infrastructure to the project site. Additionally, the Town will be contracting with an Architect/Engineering consultant, who will be responsible for working with the CM during the design phase of the project. The concept of having a CM under contract during the design phase of the project, is to save time and money by providing constructability insight, review and cost estimating during the initial stages of the project. The team of the Town of Milton DPW, Town Engineer, Town Manager, Design Architect/Engineer, Civil Engineer, and Construction Manager will work together during all phases of the project to provide a project completed on time, with quality, and within budget. Written questions are due by Thursday, July 14, 2022, 2:00 PM. It is the Towns desire to have the design and construction of the project completed by October 2023. Once an architect/engineer and construction manager are under contract, the project team will develop a schedule to meet this project completion end date. The CM shall submit a proposed schedule for the project, with the Town understanding it may change based on material availability and other factors The Construction Management Firm, prior to being awarded a contract, shall apply for registration with the Vermont Secretary of State's Office to do business in the State of Vermont, if not already so registered. The registration form may be obtained from the Vermont Secretary of State, 26 Terrace Street, Montpelier, VT 05609-1104. The telephone number is (802) 828-2386. The contract will not be executed until the Consultant is registered with the Secretary of State Office.

Details

30,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents