Last Updated 09/09/2021 04:24 PM
Project Title

Border to Border Trail Construction

Physical Address View project details and contacts
City, State (County) Chelsea, MI 48118   (Washtenaw County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Border to Border Trail Construction - Chelsea, which is located in and northwest of the City of Chelsea, MI, between Sibley and Werkner roads. The project is to construct a 10’ wide HMA trail approximately 1.63 miles in length divided into two construction phases. Phase 1 (5,000 LF) is the southern portion of the project shall be substantially complete by November 15, 2021. Phase 2 (3,600LF) is the northern part of the project and shall be substantially complete by October 15, 2022. Work includes site preparation, excavation, grading, placement of HMA, aggregate base, modular block retaining wall, culvert installation, concrete flatwork, sign installation, pavement marking, site restoration, tree planting, and related work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents