Similar Projects
Page Hall Renovation
Renovation, Alteration - 30,000 SF
Design
Raleigh, NC 27695

Annual Preventative Maintenance Services for Schneider Electric UPS Systems
Term Contract
Post-Bid
Raleigh, NC

BPA - Electrical Services at National Institute of Environmental Health Sciences
Term Contract
Post-Bid
$250,000 CJ est. value
Durham, NC 27713

Design and Installation of a Photovoltaic Electrical Generation System
Alteration
Results
Durham, NC 27704

Kenan Labs-Electrical Systems Upgrade
Alteration
Results
Chapel Hill, NC

National Computer Center Solar Photovoltaic Roof Full Expansion
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
Durham, NC 27711

ABC Store Cooler Renovations for Multiple ABC Stores
Alteration
Results
$66,803 est. value
Durham, NC 27703

Electrical Services for Repairs, Maintenance and Improvements
Term Contract
Post-Bid
Durham, NC 27707

Turnkey 100 KW Solar Installation
Alteration
Results
Durham, NC 27713

2022 Hillandale & Horton New Signal 05-1229
Infrastructure
Post-Bid
$200,000 CJ est. value
Durham, NC 27705

Fire Alarm System Replacement - Lakewood Elementary School
Renovation
Results
$322,722 CJ est. value
Durham, NC 27707

DPS Phase I District Wide Water Fountain Replacement
Infrastructure
Post-Bid
$130,000 CJ est. value
Durham, NC 27701

LED Lighting at Pearsontown Elementary School
Renovation
Results
$75,813 CJ est. value
Durham, NC 27713

Generator and ATS's Maintenance Service
Term Contract
Post-Bid
Durham, NC 27705

LED Lighting at E. K. Powe Elementary School
Alteration
Results
$95,000 est. value
Durham, NC 27705

Last Updated 05/09/2023 01:04 PM
Project Title

Installation of Directional Drilled Conduit

Physical Address View project details and contacts
City, State (County) Durham, NC 27701   (Durham County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $88,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of and the removal, if necessary, of conduit by directional drilling at various locations within the City of Durham. This project shall conform to the North Carolina Department of Transportation Liquidated damages for this contract are Five Hundred Dollars ($500.00) per calendar day, and will be charged for each calendar day, beyond the 365-day limit and all subsequent work beyond the fourteen (14) day limit, unless otherwise approved by the project engineer in writing

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents