Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Mineral Springs Park Restroom
New Construction, Infrastructure
Post-Bid
Pekin, IL 61554

Mineral Springs Park Restroom
New Construction, Infrastructure
Post-Bid
Pekin, IL 61554

Repair Broken Fire Hydrant Piping Under Concrete Slab
Term Contract
Results
East Peoria, IL 61611

Resurfacing, HMA shoulders
Infrastructure
Results
IL

Commodities And Services
Term Contract, Alteration
Post-Bid
Washington, IL 61571

Pekin Municipal Airport Crack Sealing
Infrastructure
Results
Pekin, IL 61554

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
South Pekin, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

Architectural Barriers Removal-Sidewalks
Infrastructure
Post-Bid
Armington, Creve Coeur, Delavan, East Peoria, Mackinaw, Minier, South Pekin, Washington, IL

Fire Station 1 Parking Lot Rework
Infrastructure
Results
Pekin, IL 61554

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge
Infrastructure
Results
IL

Illinois Central College Campus Pavement
Infrastructure
Post-Bid
$185,000 est. value
East Peoria, IL 61635

Last Updated 03/16/2023 06:31 AM
Project Title

Hilldale Avenue Reconstruction - Phase III

Physical Address View project details and contacts
City, State (County) Washington, IL 61571   (Tazewell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $2,037,548 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 15, 2023, this project has been awarded to Stark Excavating in the amount of $2,037,548.45. For Hilldale Avenue Reconstruction - Phase III Pre-Qualification: Yes Project consists of the reconstruction of Hilldale Ave including pavement, sidewalks, driveways, sanitary sewer, storm sewer, water main and cross road box culvert. Site Directions: Hilldale Ave. from east of West St. to Main St.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents