Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

Heating, Ventilation, Air Conditioning (HVAC) and Utility Control Systems at Chicago O'Hare International Airport
Alteration
Bidding
$200,000 est. value
Chicago, IL 60666

Lincoln Elementary School Bid Package 5 Steel- SD99 HVAC Priority 1 Work and Repairs
Alteration
Sub-Bidding
$100,000 est. value
Cicero, IL 60804

HVAC and Mechanical Products
Term Contract
Post-Bid

Robert Crown Center HVAC Maintenance
Post-Bid
Evanston, IL 60202

Geothermal Leak Repair - Goode High School
Results
Chicago, IL 60652

Replacement of Rotunda Air Handling Units
Results
Chicago, IL

River Valley RTU Replacement in Lemont
Post-Bid
Chicago, Lemont, IL 60439

Filter Backwash Valve With Hydraulic Actuator
Demolition, Term Contract
Results
Evanston, IL

Upgrade Mechanical Systems
Post-Bid
Less than $250,000 est. value
River Grove, IL 60171

Building X: AHU-2 Fan Array Retrofit
Results
Palatine, IL

Building Automation Systems-Wentworth
Term Contract
Post-Bid
$250,000 est. value
Chicago, IL 60609

Bridge Elementary School Outside Air Dampers
Results
Chicago, IL 60634

Building Automation Systems-Flannery
Term Contract
Post-Bid
$250,000 est. value
Chicago, IL 60612

Kennedy HS Air Damper and Actuator Replacement (VT Pool)
Results
Chicago, IL 60638

Last Updated 07/10/2022 11:58 PM
Project Title

Bone Marrow Fan Replacement - Division 01 - General Work

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All responses must include: There is a 30 percent BEP goal for this procurement. See solicitation documentation for details. There is a 3 percent Veteran-owned business goal for this procurement. The project consists of replacing RTU-1, 6,000 CFM roof top unit and controls for the system. Removal of Exhaust fan, EF-1, approx. 5500 CFM that serves isolation suite 882WA. Steam heating will be replaced with hot water and coil pump for new preheat coil. Chilled water will be existing campus chilled water system with a new 2 way control valve to AHU cooling coil. Demolition of the two existing chilled water booster inline pumps. Humidification will connect to existing campus steam piping. The new indoor air handling unit shall be located behind the exterior wall immediately South of Bone Marrow AHU, in the mechanical equipment room on the 9th floor. A new corresponding Exhaust Fan (EF-1) Unit will be installed on the roof, adjacent to the existing unit RTU- 1/EF-1 exhaust roof penetration. o minimize the air service interruption for Bone marrow suite a new supply air ductwork shall be run from the existing S-9 Supply air ductwork over the area where the new AHU shall be placed and penetrate the exterior wall and connect to the existing Supply ductwork above the roof but below the RTU-1. Replace fourteen (14) Air Terminal box damper actuators from Pneumatic to DDC electronic and the associated hot water reheat control valves from Pneumatic to DDC electronic and the associated space pneumatic space temperature sensor to DDC. Replace the Tridium VYKON Jace-600 controller in penthouse located near door out to the lower roof. Replace the existing Room Pressure Control/Monitoring Panel which has 11 room pressure keyed switches and Pressura room pressure monitors showing the room pressure status and replace this with a touch screen monitor to duplicate this with all DDC control.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents