Similar Projects
KPS New Edison Environmental Science Academy
New Construction
Bidding
Kalamazoo, MI 49001

Johannesburg Site Revisions BP 1
Renovation
Bidding
Johannesburg, MI 49751

Freedom Acres Addition and Remodel Administration Building Mechanical Updates
Post-Bid
Ionia, MI

High School Grandstand and Restroom Renovation
Renovation
Post-Bid
Allendale, MI

Summer Renovations
Results
Ann Arbor, MI

Kent ISD Building Remodel for Welding Program
Renovation
Results
Grand Rapids, MI

Academy of Warren Professional Construction Manager
New Construction, Renovation
Construction
$6,500,000 est. value
Warren, MI 48089

Renovations to District Offices at Liberty School
Renovation
Construction
Saline, MI

West Senior High School Auditorium Upgrades
Bidding
Traverse City, MI 49685

Vestibule Remodeling
Renovation
Post-Bid
Eaton Rapids, MI

2019 Sinking Fund Projects - Bid Package No. 1
Results
Lake Orion, MI

Arts and Athletic Center
New Construction - 74,000 SF
Construction
Berrien Springs, MI

Main Entrance and Staff Restroom Renovation
Renovation
Bidding
Petoskey, MI 49770

Lowell Area Schools - Bid Package 1
Post-Bid
Alto, MI 49331

Renovations to Union High School
Results
Grand Rapids, MI 49504

Last Updated 09/02/2020 02:47 PM
Project Title

New Agriculture Building

Physical Address View project details and contacts
City, State (County) Manchester, MI   (Washtenaw County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Entire package (excavation, concrete, building materials, labor, and electrical). Red screws for steel wall Siding screws for steel roof Galvanized steel framing nails Red Steel Siding White Steel Roof Seven 3 ft x 3 ft single hung windows Two Commercial Garage Door – 12 ft. x 11 ft. (no windows) with openers Two utility doors – 3 ft Wood Trusses (4/12 pitch 2 ft oc) 6 x 6 Treated Eave Posts (8 ft oc) 6 x 6 Treated Gable Posts (10 ft oc) 2 x 6 Treated Skirt Boards (3 rows) 2 x 4 Wall Girts (24 inch oc) 2 x 12 Double Top Girt Truss Carrier Plywood – 5/8” CDX – on roof 12 inch overhang on all sides Alum. Soffit Place grade & compact approx.. 120 tons of C2 Fill sand to proper subgrade Poured concrete floor Finish grade of topsoil around perimeter of building near completion Concrete – 1 bag mix per post hole

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents