Similar Projects
Landfill Services
Results
Minersville, PA 17954

Landfill
Post-Bid
Wind Ridge, PA

35X-166308-Rosencrase Landfill Project
Post-Bid
PA

Landfill Gas Management System Construction
Infrastructure
Post-Bid
Troy, PA

Frey Farm Landfill 2020 Cap Construction
Results
Lancaster, PA 18938

Landfill 2020 Area D Final Cover System Construction
Results
$6,000,000 to $9,000,000 est. value
Narvon, PA 17555

Landfill Services for Solid Waste
Post-Bid
PA

Landfill 2 Fields 1RB and 3R Bulk Excavation
Infrastructure
Post-Bid
Troy, PA

Landfill Gas Wells, Liquid Pumps and Air Compressor
Infrastructure
Results
PA

Cell 2A Geosynthetic Liner
Post-Bid
Saint Clair, PA

Lycoming County Landfill Leachate and Gas System Cleaning, Inspection and Pipe Improvements
Results
$595,700 est. value
Montgomery, PA 17752

Lycoming County Landfill Leachate and Gas System Cleaning, Inspection and Pipe Improvements
Results
$595,700 est. value
Montgomery, PA 17752

Blythe Recycling and Demolition Site Brads Landfill Cell 2A Blasting
Post-Bid
Saint Clair, PA

2022 Area E - Cell 2B & MSE Wall Construction
Infrastructure
Bidding
$7,000,000 to $8,000,000 est. value
Lancaster, PA 17555

Installation of the Landfill Liner System
Infrastructure
Results
Troy, PA

Last Updated 07/29/2021 09:39 AM
Project Title

Frey Farm Landfill Vertical Expansion Stage 2 Construction

Physical Address View project details and contacts
City, State (County) Conestoga, PA 17516   (Lancaster County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The installation of approximately 3.6 acres of liner system; 2. The construction of mechanically stabilized earth berm, including soil processing; 3. The installation of haul and access roads; 4. The installation of leachate collection and conveyance infrastructure; and 5. The installation of stormwater control features

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents