Similar Projects
Repair of Walls in Central Park
Results
Swarthmore, PA 19081

Newsome Property Improvements
Results
Aston, PA 19014

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

FY 2019 CDBG Storm Drainage Improvements along Kelly Avenue
Post-Bid
Folsom, PA 19033

Storm Drainage Improvements
Results
Norwood, PA 19074

FY 2019 CDBG Storm Drainage Improvements Project
Results
Wallingford, PA 19086

Storm Drainage Improvements along Kelly Avenue-Morris Avenue-Duryea Drive
Post-Bid
Folsom, PA 19033

Replacement of Twin 30 Culverts on Clearbrook Road
Results
Newtown Square, PA 19073

Reservoir Park - Stream Restoration
Results
Lansdowne, PA 19050

Swarthmore Rutledge School Playground Drainage Mitigation Project
Results
Swarthmore, PA 19081

Gateway Slope
Results
Lansdowne, PA

State Game Lands #183 Shooting Range Improvements
Post-Bid
Palmyra, PA

Whiteley Road Culvert Replacement
Results
Brookhaven, PA 19015

Storm Drainage Improvements - Carre Avenue
Bidding
Less than $100,000 est. value
Tinicum Township, PA 19029

Gouley Park Streambank Improvements
Bidding
$25,000 est. value
Media, PA 19063

Last Updated 02/21/2020 10:33 AM
Project Title

Rehabilitate Road Residential Lease Access Phase III

Physical Address View project details and contacts
City, State (County) Media, PA 19063   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work included under this contract consists of reclamation and repaving of approximately a 1-mile section of existing paved trail including repairs of heavily eroded creek side trail shoulder areas, replacement of five (5) existing culvert pipes, and adding one (1) new culvert pipes, installation of two (2) new type M concrete box inlets, restoration of the ditch lines along both sides of the trail at indicated areas for storm water drainage improvement, and providing a minimum 2 foot wide aggregate shoulder along both sides of the newly repaved trail as indicated on the contract drawings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents