Similar Projects
Lake Ballinger/Hall Creek Ecosystem Restoration
Infrastructure
Design
$10,000,000 CJ est. value
Mountlake Terrace, WA 98043

SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

PWC - 236 th St. Conduit Installation and I-5 Bridge Crossing (Re-Bid 2)
Infrastructure
Bidding
$1,370,886 CJ est. value
Mountlake Terrace, WA 98043

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

Culmback Dam 48 Inch Cone Valve Replacement Project
Renovation
Results
WA

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

SR 531/43rd Ave NE to 67th Ave NE - Widening
Infrastructure
Design
$29,204,000 CJ est. value
Marysville, WA 98271

Lynnwood Municipal Golf Course Irrigation Pump Station Fabrication
New Construction, Infrastructure
Bidding
$216,222 CJ est. value
Lynnwood, WA 98036

Skagit Wildlife Area North Leque Restoration
Infrastructure
Post-Bid
$375,000 est. value
Stanwood, WA

Swift Brt Orange Line Construction
Infrastructure
Results
Everett, WA 98201

Westgate Station
New Construction, Infrastructure - 4,700 SF
Design
$9,000,000 CJ est. value
Edmonds, WA 98020

Seaview Park Infiltration Facility Phase 2
Infrastructure
Bidding
$495,600 CJ est. value
Edmonds, WA 98026

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Last Updated 08/22/2022 02:32 PM
Project Title

Yost and Seaview Reservoirs Repairs and Upgrades

Physical Address View project details and contacts
City, State (County) Edmonds, WA 98020   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As of August 4, 2022, the project is in preliminary design. The construction documents completion timeline has not been determined. Construction is slated to begin in 2023; however, the firm date has not been established.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents