Similar Projects
Alaris IV Pumps
Post-Bid
Chicago Heights, IL

Replace Pump 8 and Install New VFD for Pump 13 at the Touhy Avenue Pump Station
Infrastructure
Post-Bid
Niles, IL 60714

Mainstream Tarp Pumps Rehabilitation
Results
$19,484,000 to $23,585,000 est. value
Hodgkins, IL 60525

Six Shafts Infiltration Mitigation
Term Contract
Results
$1,874,000 to $2,269,000 est. value
Hodgkins, IL 60525

Well Sealing Villa Santa Maria Convent
Infrastructure
Post-Bid
Less than $25,000 est. value
Oak Forest, IL 60452

Water Treatment Plant High Service Pump Replacement
Results
Chicago, IL

Inspection, Preventative Maintenance, Repair, Replacement of VFD Pumps
Term Contract, Infrastructure
Post-Bid
Chicago, IL

CPS Burbank ES Chilled Water Pump Replacement
Renovation
Results
Chicago, IL 60639

Well 15 - Maintenance, Repair and Rehabilitation
Infrastructure
Post-Bid
Schaumburg, IL

CPS Walt Disney Magnet Ejector Pump Loading Dock Replacement
Results
Chicago, IL 60613

Pump Preventative Maintenance and As-Needed Repairs
Term Contract
Post-Bid
Glenview, IL

CPS Haines ES Booster Pump Replacement
Term Contract
Results
Chicago, IL 60616

Pentair Hydromatic Pumps
Infrastructure
Post-Bid
Chicago, IL

Water Supply Well No. 4 Abandonment
Infrastructure
Results
Mount Prospect, IL

Inspection, Maintenance and Repair of Lysimeters and Groundwater Monitoring Wells
Infrastructure
Results
$36,000 est. value
Chicago, IL

Reported 04/12/2022 12:00 AM
Project Title

Water Supply No. 17 Rehabilitation

Physical Address View project details and contacts
City, State (County) Mount Prospect, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pulling, Inspecting, rehabilitating/replacing components and reinstalling pumping equipment in the well including testing and other miscellaneous items

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents