Similar Projects
Menards / Bradley
New Construction, Infrastructure - 200,000 SF
Design
$25,000,000 CJ est. value
Bradley, IL 60915

Construction of a Storage Building
New Construction, Infrastructure
Design
Bourbonnais, IL 60914

Removal Existing Super Structure -PPC Conc Deck Beam
Demolition, New Construction, Infrastructure
Bidding
$550,000 CJ est. value
Bourbonnais, IL 60914

Hma Removal, Pcc Sidewalk Removal and Replacement
Infrastructure
Bidding
$2,000,000 CJ est. value
Bourbonnais, IL 60914

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Public Works Salt Shed
New Construction
Post-Bid
$90,000 est. value
Kankakee, IL 60901

2022 RLF Concrete Program
Infrastructure
Results
$478,482 CJ est. value
Bradley, IL 60915

New Public Works Facility Bid Package #3 - Site Work
Infrastructure
Results
$332,000 est. value
Manteno, IL

Chick-Fil-A / Bradley
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Bourbonnais, IL 60914

Belson Steel Relocation
Build-Out
Pending Verification
Bourbonnais, IL

Hot Mix Asphalt Surface Removal
Infrastructure
Bidding
$2,000,000 CJ est. value
Bradley, IL 60915

2022 Community Center Fieldhouse Addition at Kankakee High School
Addition, Demolition, Infrastructure, Build-out
Post-Bid
$441,000 CJ est. value
Kankakee, IL 60901

New Manteno Public Works Facility - Bid Package 2 - Building and Build-Out
Build-Out - 83,000 SF
Results
$5,000,000 est. value
Manteno, IL

Intersection of IL-17 and IL-1
Infrastructure
Bidding
$500,000 CJ est. value
Momence, IL 60954

The Group IV Work
Infrastructure
Post-Bid
$1,926,000 CJ est. value
Kankakee, IL 60901

Last Updated 05/16/2023 03:32 PM
Project Title

Momence CUSD 1-Building

Physical Address View project details and contacts
City, State (County) Momence, IL 60954   (Kankakee County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the construction of an approximately 1,080 sq ft. engineered post wood frame storage building.A Prebid Meeting will not be held. For visit to site contact Architect. F. Submit your offer on the Bid Form provided.Bidders will NOT be required to provide Bid security.. I. The successful Bidder will be required to furnish a satisfactory Performance Bond and Labor and Material Payment Bond for the full amount of the bid accepted. 1. The Performance Bond and Labor and Material Payment form shall be AIA Document A3 111 - "Performance Bond" and AIA Document A311 - "Labor and Material Payment Bond". J. Refer to other bidding requirements described in Document 00 2113 - Instructions to Bidders K. Your offer will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. L. PREVAILING WAGES: 1. Contractors will be required to comply with all laws, including those relating to prevailing rate of wages of the various classes of work to be performed under the proposed contract as determined by the Illinois Department of Labor, in accordance with Federal Labor Standards provisions. US Department of Labor. The Owner reserves the right to accept or reject any or all offers.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents