Similar Projects
Cole Road to South Ricardo to North Ricardo to Anzar Road - PWB-2105 - San Benito County
Infrastructure
Conception
$674,844 CJ est. value
Aromas, CA 95004

Anzar Road Bridge Over San Juan Creek - RF 24-694 - San Benito County
Demolition, New Construction, Infrastructure
Conception
$1,676,000 CJ est. value
Aromas, CA 95004

Hotel Durell / Pacific Grove
New Construction, Infrastructure - 68,400 SF
Design
$12,000,000 CJ est. value
Pacific Grove, CA 93950

Carr Avenue Bridge Replacement - San Benito County
Demolition, New Construction, Infrastructure
Design
$675,000 CJ est. value
Aromas, CA 95004

RHMA (Gap Graded), Concrete Barrier Transition and Lighting Systems
Infrastructure
Bidding
$5,700,000 CJ est. value
Salinas, CA 93907

Citywide Curb Ramp Project, Phase 7
Infrastructure
Bidding
$640,000 CJ est. value
Monterey, CA 93940

Mass Excavation of Solid Waste Landfill Cell (Module 7 Phase 2)
Infrastructure
Post-Bid
$970,000 est. value
Marina, CA 93933

Monterey Regional Airport New Passenger Terminal Facility
New Construction, Infrastructure - 65,000 SF
Post-Bid
$65,000,000 CJ est. value
Monterey, CA 93940

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

CSUMB Aquatic Center - New Equipment Storage Addition
Addition, Demolition, Renovation, Infrastructure
Construction
$457,754 CJ est. value
Seaside, CA 93955

Miravale II / Soledad
New Construction, Infrastructure
Pending Verification
$47,000,000 CJ est. value
Soledad, CA 93960

Soledad Community Health Care District Medical Clinic
New Construction, Infrastructure - 3,600 SF
Pending Verification
$2,000,000 CJ est. value
Soledad, CA 93960

Institute for Public Policy - California State University - Monterey Bay
New Construction, Infrastructure - 37,600 SF
Conception
$60,023,000 CJ est. value
Seaside, CA 93955

Oak Street Residential Subdivision
New Construction, Infrastructure - 7,940 SF
Design
$2,000,000 CJ est. value
Greenfield, CA 93927

Last Updated 10/11/2023 11:18 AM
Project Title

Moss Landing Underground Storage Tank Removal Project

Physical Address View project details and contacts
City, State (County) Marina, CA 93933   (Monterey County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $39,013 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Perform services for the removal of an underground storage tank at the Moss Landing Pump Station of Monterey One Water. The Contractor shall perform all Work within the time stipulated in the contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the work required in strict compliance with the Contract Documents Question Deadline 08/30/2023 at 5:00 PM PT Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond in an amount not be less than ten percent (10%) of the submitted Total Bid Price. A hard copy of the Bid Security must be received by Monterey One Water prior to the date and time of the bid opening, or the bid will be considered nonresponsive. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price, PRIOR TO EXECUTION OF THE Contract. For further information, contact Jennifer Gonzalez, Engineering Manager, at jennifer@my1water.org or (831) 883-6172. The Contractor and its surety shall be liable to M1W for any damages arising as a result of the Contractor's failure to comply with this obligation. Without limiting the foregoing description, Contractor's scope of work includes, but is not limited to, the following: - Submit all required samples, product data, certificates, operations and maintenance instructions, guarantees, and other submittals no later than five (5) days after the date M1W issues a Notice to Proceed. - Obtain all necessary permits and approvals for the Work. - Protect all materials to be used in the Work in accordance with the specifications. - Protect existing facilities and personal property. - Attend a preconstruction conference with M1W to discuss schedule, access, sequence of work, and other issues. - Prepare and submit a written daily activity report to M1W for each day on which work is performed, including weekends and holidays when worked, and submit the reports to M1W no later than the next business day. The daily reports shall, at a minimum, include the following information: construction activities and locations, construction crew sizes of general and subcontractors, start or completion of activities, progress on construction activities (including units or portions of work completed), tests or inspections performed, deliveries of material or equipment, delays or potential delays, visitors to the site, weather conditions, construction equipment used, and personal injuries or damage to property. - The Contractor shall be responsible for unloading, hoisting and otherwise handling its own materials, supplies and equipment. - Coordinate with owner-scheduled events. - The Contractor is responsible for researching and complying with all local codes, agencies and jurisdictions that regulate and govern the Work. - Contractor shall set up, identify, coordinate, provide safe access, and obtain all inspections for its work, as required by any authorized agency or applicable code, prior to covering up work

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents