Similar Projects
2022 CIPP Rehabilitation Project Prequalification
Infrastructure
Bidding

Knolls Fire Erosion Mitigation Project Phase 2
Post-Bid
Less than $901,255 est. value
Saratoga Springs, UT 84045

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

Crab Creek Restoration
Results
$310,000 to $330,000 est. value
Provo, UT 84606

Traverse Mountain Emergency Watershed Protection
Results
Lehi, UT 84043

UDOT Drainage Repair US 89 MP 340.10 on the Left Side of the Road
Infrastructure
Post-Bid
Orem, UT 84097

Lower School House Springs - Phase II
Results
Less than $350,000 est. value
Lehi, UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Construction of the 2021 Provo City Lakeview Parkway Phase 4
Results
Provo, UT

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

New Bingham Highway Detention Park
Results

2022 Scera Park Pool Drainage Project - Phase I
Infrastructure
Post-Bid
Orem, UT 84057

Saratoga Springs Lake Mountain Zone 2 South Pond and Losee Canyon Debris
Results
Saratoga Springs, UT

UDOT Lehi MS4 project
Results
Lehi, UT 84043

Debris Flow Mitigation Project
Term Contract
Results
Orem, UT

Last Updated 02/10/2022 09:58 AM
Project Title

2021 Taylor Drain Project

Physical Address View project details and contacts
City, State (County) Orem, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The work includes removal of existing storm drain pipe, placement of 48” Ø RCP, placement of rip rap, dredging existing ditch and hauling off excavated spoils, placement of road base, and hydroseeding. The site of the work is located at Taylor property located at approximately 2000 South and 1600 West.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents