Similar Projects
New Transit Center Construction
New Construction - 3,000 SF
Conception
$40,000,000 est. value
San Rafael, CA

Next Generation Transit Maintenance, Operations, and Administration Facility
New Construction
Conception
$42,500,000 est. value
Linda, CA 95901

Transportation Security and Operations Center (TSOC)
New Construction - 30,000 SF
Design
$38,000,000 est. value
Anaheim, CA 92808

Santa Cruz Metro Paratransit Facility
New Construction - 4,815 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Santa Cruz, CA

SFMTA Potrero Yard Modernization Project
Alteration
Bidding
$311,500,000 est. value
San Francisco, CA 94110

To Provide Bus Shelters in the City of Anaheim
Renovation
Bidding
$100,000 est. value
Anaheim, CA

PCPA Stagecraft Building Project
New Construction, Addition - 7,789 SF
Post-Bid
$5,732,852 est. value

PCPA Stagecraft Building Project
New Construction, Addition - 7,789 SF
Post-Bid
$5,732,852 est. value

Painting of Interior Vehicle Shop
Alteration
Results
Long Beach, CA 90806

Bus Hydrogen Refueling Station Consulting And Project Management Services
Renovation
Results
Santa Clarita, CA 91355

Bus Maintenance Facility Sheehy Court
New Construction
Construction
$25,000,000 est. value
Napa, CA 94558

2100 Mission Street
New Construction, Demolition - 28,700 SF
Construction
$2,000,000 est. value
San Francisco, CA 94110

Oakland International Airport Major Expansion and Modernization
New Construction, Renovation
Pending Verification
Oakland, CA 94621

Indigo Hotel
New Construction, Demolition - 119,000 SF
Conception
$10,000,000 CJ est. value
San Carlos, CA 94070

Mountain View Transit Center Grade Separation & Access
Renovation
Design
Mountain View, CA

Reported 06/21/2022 09:57 AM
Project Title

Coastal Bluff Track Bed Stabilization And Seismic Improvements / Del Mar Bluffs Stabilization Phase 5 - San Diego Association Of Governments

Physical Address View project details and contacts
City, State (County) San Diego, CA 92101   (San Diego County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected October 2023
Bids Due View project details and contacts
Estimated Value $11,570,250 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitates and upgrades a section of North County Transit District-owned track located on sensitive coastal bluffs in Del Mar, Calif., to protect against erosion that has disrupted rail service in the corridor multiple times in recent years. The work includes installing new subsurface drainage, concrete ditches, storm drains, and new support piles for seismic stability and slope stabilization. The project provides safety and reliability benefits to all railroads operating over the corridor, including Amtrak's PacificSurfliner service, North County Transit District's Coaster service and freight carriers. As of June 2022, phase 5 of the bluff stabilization construction is to begin in late 2023 and be completed in 2026. Information regarding general contractor selection has not been disclosed.

Details

Misc. Structures, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents