Similar Projects
Last Updated | 01/18/2019 01:11 PM |
Project Title | Phase II I and I Reduction Project - Wastewater Collection System I and I Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Sullivan's Island, SC (Charleston County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 2. The Project is a Construction Management (CMAR) at Risk Project, which requires the services of a Professional Engineer (P.E.) who is also a licensed Contractor in the State of South Carolina. 2. The project will include chemical grouting through a test-and seal process of approximately 41,000 linear feet of wastewater mains and laterals in Basins 1, 2, 3, 4, 5 and 6 of the Tow's wastewater collection system (see attached map), with a goal of reducing I/I by 60% in the defined project area. 3. The Engineer/Construction Manager at Risk shall assume complete responsibility for complete design, specification, management, and control of the project's implementation in cooperation with the Town's designated representatives. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |