Similar Projects
Cardiff Row - Phase 2
New Construction
Conception
Cincinnati, OH 45209

Wasson Way Uptown Connector Trail - State of Ohio
Infrastructure
Conception
$250,000 est. value
Cincinnati, OH 45207

Lindsay Lofts and Blair Lofts Phase II
New Construction, Infrastructure
Design
$24,000,000 CJ est. value
Cincinnati, OH 45229

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Hamilton County - Portune Center Basement Concrete Beam and Deck Repairs
Infrastructure
Bidding
$123,000 CJ est. value
Cincinnati, OH 45202

Blacktop on Bells Run Road
Post-Bid
White Oak, OH

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Major Reconstruction - HAM-74 - 18.01
Results
Cincinnati, OH 45203

Addyston Park Road and Walking Path Asphalt Project
Results
Addyston, OH 45001

Montgomery Quarter
New Construction - 192,000 SF
Construction
$150,000,000 est. value
Montgomery, OH 45242

Montgomery Quarter - Public Site Improvements - Sequence 3
Construction
$5,200,000 est. value
Cincinnati, OH 45242

Logan Street Mixed Use
New Construction, Infrastructure - 20,000 SF
Pending Verification
$5,000,000 CJ est. value
Cincinnati, OH 45202

Logan Street Mixed Use
New Construction, Infrastructure - 20,000 SF
Pending Verification
$5,000,000 CJ est. value
Cincinnati, OH 45202

Wyler Colerain Honda Vehicle Storage Lot
Infrastructure
Design
$100,000 CJ est. value
Cincinnati, OH 45251

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Last Updated 09/22/2022 10:37 AM
Project Title

First Street Improvements (OPWC)

Physical Address View project details and contacts
City, State (County) Addyston, OH 45001   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $243,795 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

First Street Improvements (OPWC) Completion Date: November 4 Proposals must contain the full name of the party or parties submitting the same and all persons interested therein. Each bidder is required to furnish with his proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. When the total overall project exceeds $28,789 all bidders must comply with the Prevailing Wage rates on Public Improvements in Hamilton County and the Village of Addyston, Ohio, as ascertained and determined by the Administrator of the Ohio Bureau of Employment Services (OBES) as provided in Section 4115.05 through 4115.034 of the Revised Code of the State of Ohio. It is anticipated that the Prevailing Wage Law will apply to this project. All contractors and subcontractors involved with the project will to the extent practicable use Ohio products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123 is required. Domestic Steel Use Requirements as Specified in Section 153.011 of the Revised Code Apply to This Project. Copies of Section 153.011 of the Revised Code Can Be Obtained From the Office of the Ohio Facilities Construction Commission. The Council of the Village of Addyston, Ohio, reserves the right to waive irregularities and to reject any or all bids. The Council of the Village of Addyston shall authorize acceptance of the bid made by the responsible bidder who, in Council's judgment, offers the best and most responsive proposal to the Village, considering quality, service, performance record, and price; or Council may direct the rejection of all bids. The Village may award based on "functional equivalence" concerning specified work or products. SCOPE OF WORK In general. The following are the major construction items for the First Street Stabilization project: Install approximately 210 LF of drilled shaft pier wall consisting of 30" soldier piers and 36" diameter plug piers. Mill existing pavement full width to remove deteriorated asphalt surface (3") and placement of a 1-1/2" intermediate course in the asphalt resurfacing section. Perform pavement repairs as necessary. Remove existing pavement structure and the placement of aggregate base, asphalt base, and 1-1/2" intermediate course within the roadway reconstruction section. Curb and sidewalk removal and replacement where indicated Drive apron removal and replacement where indicated New storm sewer inlet, remove and replace existing inlets and catch basin(s) as needed. Installation of guardrail where indicated. New pavement markings

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents