Similar Projects
Davie Street Streetscape Storm and Water Improvements
Bidding
Greensboro, NC 27401

Kannapolis Crossing Contract 1 Water Line
Bidding
Kannapolis, NC

East River Phase 1 Project
Post-Bid
Clayton, NC 27527

Maple Street/Merritt Street Water Improvements Project
Post-Bid
Mount Airy, NC 27030

Area 1 Elementary School Off-Site Utilities
Results
Carthage, NC

Colington Road - SR 1217 Water Main Improvements Project
Results
Less than $600,000 est. value
Kill Devil Hills, NC 27948

East State Ave Water and Sewer PH-2
Bidding
$639,420 est. value
High Point, NC 27262

Construction of the Fire Flow Improvements and Water Main Replacement Phase 3
Post-Bid
Roanoke Rapids, NC 27870

Faculty Drive Waterline Construction
Results
Wingate, NC

Access Road and Early Grading
Bidding
Clayton, NC

Henderson Vance Industrial Park Expansion
Post-Bid
Henderson, NC 27536

Meter Boxes and Lids
Results
Less than $203,397 est. value
Winston-Salem, NC

2018 Water System Improvements Phase 2 Contract Number 3 Water Line Replacement
Bidding
$800,000 to $900,000 est. value
Lucama, NC 27851

Irongate Subdivision Waterline Extension
Post-Bid
Apex, NC

2019 Waterline Replacements
Results
Less than $1,158,009 est. value
Fuquay-Varina, NC

Last Updated 04/12/2021 08:16 AM
Project Title

AC and Continental Drive Water Line Replacement

Physical Address View project details and contacts
City, State (County) Durham, NC 27712   (Durham County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,108,820
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Installation of approximately 4,000 linear feet of 8-inch diameter water lines located along the alignment, valves and all other appurtenances as shown on the Drawings and as specified. 2. Installation of new – and reconnection of existing – fire services as shown on the Drawings and as specified. 3. Grading, paving, erosion control, site cleanup, and seeding 4. Disposal of excess and unsuitable excavation and removed excess materials. 5. Testing of all installed water infrastructure 6. Temporary facilities (including bypass pumping and temporary water) as required to maintain service during construction and connection to the new facilities. 7. General conditions including scheduling, project coordination, field work and surveying, environmental protection procedures, submittals and shop drawings, operations and maintenance data, and other requirements as specified for the coordination and execution of the Work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents