Similar Projects
System Preservation (Restoration/Rehab/Resurface)
Bidding
Less than $3,000,000 est. value
AZ

Safety Improvements
Bidding
Less than $250,000 est. value
Casa Grande, AZ

Asphalt Cold Patching Materials; Upm, Aquapatch and Aquaphalt Bulk and Bagged
Post-Bid

Construction Manager at Risk for Aquatics Center and Northern Avenue Reconstruction
Post-Bid
Coolidge, AZ 85128

System Enhancement (Other Enhancements)
Results
Less than $2,580,000 est. value
Apache Junction, AZ 85119

Capacity Additions (Reconstruction)
Results
Less than $4,800,000 est. value
Maricopa, AZ 85138

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ

Construction of Anthem at Merrill Ranch CFD 2 Phase XVI - Merrill Ranch Parkway 3 Concrete, Paving and Landscaping and CFD 1 Felix Road Landscaping
Results
Florence, AZ

Pavement Rehabilitation
Results
Less than $21,100,000 est. value
AZ

Chip Seal
Results
Less than $1,200,000 est. value
AZ

Pavement Raising and Under Seal Services
Results

Pave Dirt Road
Results
Less than $2,922,000 est. value
AZ

Pave Dirt Road
Results
Less than $2,922,000 est. value
AZ

Milling and Asphalt Replacement Services
Results

Pavement Rehabilitation
Results
Less than $10,900,000 est. value
AZ

Last Updated 01/14/2019 02:33 AM
Project Title

Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) AZ   (Pinal County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $21,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The proposed project 008 PN 147 F011201C is located in Pinal County on I - 8. The work begins at MP 147.61 and extends to MP 158.50 (EB & WB). The work consists of milling and removal of existing pavement, placement of aggregate base material, replacement of pavement with Asphaltic Concrete End Product and Asphaltic Concrete Friction Course, removing and replacing guardrail, applying pavement markings and other related work. The proposed project 008 PN 158 F003501C is located in Pinal County on I - 8. The work begins at MP 158.50 and extends to MP 170.20 (EB & WB). The work consists of milling the existing asphaltic concrete friction course pavement, replacement of pavement with Asphaltic Concrete Friction Course, applying pavement markings and other related work.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents