Similar Projects
Breed - Townsend, Parkway Drive - CTH W
Infrastructure
Bidding
Breed, Townsend, WI

Twin Valley Road Improvements
Infrastructure
Bidding

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Flatley Avenue Reconstruction
Results
$605,000 est. value
Oconto Falls, WI

2021 Harbor Road and Splinter Causeway Reconstruction
Results
$2,250,000 est. value
Oconto, WI 54153

T. Underhill, CTH R, Shawano County Line - CTH VV
Results
WI

2021 Splinter Causeway Reconstruction
Results
$1 to $300,000 est. value
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Pulaski - STH 22, Pulaski NVL - CTH E; Pulaski - STH 22, CTH E - STH 22
Results
Pulaski, WI

Pedestrian Bridge - Chute Pond Park
Results
WI

2021 Cross Road Improvements
Infrastructure
Results
Sobieski, WI

2021 Sanitary Sewer Construction - Wood Creek Properties
Infrastructure
Results
$175,000 est. value
WI

Last Updated 03/22/2022 08:08 AM
Project Title

Park Avenue Reconstruction

Physical Address View project details and contacts
City, State (County) Oconto Falls, WI 54154   (Oconto County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the project consists of the complete reconstruction of Park Avenue in the City of Oconto Falls. The reconstruction between Sheridan Street and Green Bay Avenue includes the replacement of 1,360 lineal feet of watermain, 1,110 lineal feet of sanitary sewer, 1,160 lineal feet of storm sewer, 2,080 tons of aggregate base course, 1,125 tons of HMA pavement, 2,520 lineal feet of curb and gutter, 2,550 square feet of concrete driveway, lawn restoration, and related items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents